31.08.2017 12:00South Humber Bank Power Station – change of ownership

From 1 September 2017, ownership and control of South Humber Bank Power Station (comprising BMUs T_SHBA-1 and T_SHBA-2) transfers to EP UK Investments Ltd (EPUKI). All future REMIT notifications for these assets that have been published by Centrica will be made inactive on or before 8 September 2017. From 1 September 2017, for information  pursuant to REMIT in respect of these assets, please refer to the EPUKI webpage (https://www.epuki.co.uk/).

CE-RMT-OTHER-20170001_00101.09.2017 00:00 Unknown ActiveBritish Gas Trading Ltd21X000000001111W
31.08.2017 12:00Langage Power Station – change of ownership

From 1 September 2017, ownership and control of Langage Power Station (comprising BMU T_LAGA-1) transfers to EP UK Investments Ltd (EPUKI). All future REMIT notifications for this asset that have been published by Centrica will be made inactive on or before 8 September 2017. From 1 September 2017, for information  pursuant to REMIT in respect of this asset, please refer to the EPUKI webpage (https://www.epuki.co.uk/).

CE-RMT-OTHER-20170001_00101.09.2017 00:00 Unknown ActiveBritish Gas Trading Ltd21X000000001111W
05.07.2016 09:02Peterborough Power Station 5th July 2016

Peterborough Power Station has been awarded a further STOR contract from 1st April 2017 until 31st March 2018.

CE-RMT-OTHER-20160004_001 Unknown Unknown - - -
28.06.2016 18:17Langage power station 28th June 2016

REMIT publications for Langage power station (LAGA-1) 48X000000000065T-CE-RMT-00000445 and 48X000000000065T-CE-RMT-00000427 represent an outage at each of the Gas Turbines (GT) at LAGA-1 and, therefore, should be considered in aggregate.

CE-RMT-OTHER-20160003_001 Unknown Unknown - - -
03.06.2016 15:44OC2 2 - 14 day data for Lincs Wind Farm1 and 2

The OC2 2-14 day data for Lincs Wind Farm 1 and 2 (LNCSW-1 and LNCSW-2) published on 01, 02 and 03 June 2016 for 15 June 2016 incorrectly shows 0 MW Output Useable (OU), whereas it should show full availability. The OU will be corrected in the next OC2 2-14 day submission due to be published by NGC on Monday 06 June 2016. Any information in respect of LNCSW-1 and LNCSW-2 that we consider to constitute inside information pursuant to REMIT will be disclosed on our REMIT webpage.

CE-RMT-OTHER-20160002_001 Unknown Unknown - - -
25.02.2016 17:21Barry Power Station - update

Barry Power Station has been awarded a STOR contract from 1 October 2016 until 1 April 2018 and has applications pending to increase its maximum output (TEC) to 142MW in line with this contract and to 235MW from April 2018.

CE-RMT-OTHER-20160001_001 Unknown Unknown - - -
18.12.2015 13:44Peterborough Power Station: update

Peterborough has increased its TEC holding from 1 April 2016 to 245MW in line with its STOR contract commitments for 2016/17.

CE-RMT-OTHER-20150013_001 Unknown Unknown - - -
11.12.2015 16:56Killingholme Power Station - closure

Following the recent SBR announcements from National Grid, Killingholme Power Station has now exhausted all options and will close on 1 March 2016 following the conclusion of its current SBR contract. Conversations are ongoing with employees impacted.

CE-RMT-OTHER-20150012_001 Unknown Unknown - - -
11.12.2015 14:12Barry Power Station - update

Following the result of the latest SBR tender round for winter 2016/17, the steam turbine at Barry Power Station will be returned into preservation on completion of the current SBR contract, namely 1 March 2016. 

CE-RMT-OTHER-20150010_001 Unknown Unknown - - -
11.12.2015 14:12South Humber Bank Power Station - update

Further to our supplementary market notification of 24 March 2015, which declared a reduction in maximum output from South Humber Bank Power station (which comprises BMUs T_SHBA-1 and T_SHBA-2), the station has recently been successful in obtaining an SBR contract for winter 2016/17.

This will make capacity from T_SHBA-1 available in the SBR for winter 2016/17, which amounts to 750MW. The station is still set to return to full capacity from 1 April 2017. 
 

CE-RMT-OTHER-20150011_001 Unknown Unknown - - -
20.10.2015 15:44Peterborough Power Station

Peterborough Power Station (PPS) remains contracted under Short Term Operating Reserve (STOR) and may be declared unavailable to generate outside of STOR availability windows. Information in respect of PPS that we consider to be inside information pursuant to REMIT will be published to the Centrica REMIT webpage.

CE-RMT-OTHER-20150009_001 Unknown Unknown - - -
24.09.2015 16:53Barry Power Station - reduction in maximum output

With effect from 1 April 2016, the maximum output for Barry Power Station will reduce from 245MW to 0 MW. This is in line with it's operation in the Supplemental Balancing Reserve (SBR) service.

CE-RMT-OTHER-20150008_001 Unknown Unknown - - -
18.09.2015 16:53OC2 2 - 52 week data for South Humber 2

The OC2 2-52 week data for South Humber 2 (SHBA-2) published on 17 September 2015 for Week 40 of 2015 to Week 37 of 2016 was submitted in error and will be corrected in the next OC2 2-52 week submission due to be published by NGC on Thursday 24 September 2015. Until such time, the OC2 2-52 week data for SHBA-2 published on 10 September 2015 remains the best estimate of SHBA-2’s OC2 2-52 week forward availability. Any information in respect of SHBA-2 that we consider to constitute inside information pursuant to REMIT will be disclosed on our REMIT webpage.

CE-RMT-OTHER-20150007_001 Unknown Unknown - - -
20.07.2015 09:32Change to Centrica Energy's REMIT webpage

Centrica Energy’s publications, according to article 4(1) of REMIT, will be moving from http://www.centrica.com/index.asp?pageid=95 to http://www.centricaremit.com/remit.xml with effect from 25 July 2015. Please update your records accordingly.

CE-RMT-OTHER-20150006_001 Unknown Unknown - - -
02.07.2015 17:30Brigg Power Station

With effect from 2 July 2015, Brigg Power Station will operate as an embedded generation unit with a capacity of 99MW. Consequently, it is no longer under consultation for closure as set out in the urgent market message of 5 March 2015.

CE-RMT-OTHER-20150005_001 Unknown Unknown - - -
04.06.2015 17:31Killingholme Power Station – Proposed Closure Subject to Consultation

Killingholme Power Station was awarded a Supplemental Balancing Reserve (SBR) contract for Winter 2015/16 by National Grid on 3 June 2015. However, it still remains under consultation for closure as set out in the urgent market message of 5 March 2015.

 

CE-RMT-OTHER-20150004_001 Unknown Unknown - - -
15.05.2015 10:40Barry Power Station - overnight availability

From 15 May 2015, Barry Power Station (BPS) may be declared unavailable to generate overnight. Information in respect of BPS that we consider to be inside information pursuant to REMIT will be published to the Centrica REMIT webpage.

CE-RMT-OTHER-20150003_001 Unknown Unknown - - -
30.03.2015 15:15Barry Power Station - return to normal commercial operation

From 1 April 2015, Barry Power Station (BPS) returns to normal commercial operation with a nominal capacity of 245 MW. Information in respect of BPS that we consider to be inside information pursuant to REMIT will be published to the Centrica REMIT webpage.

CE-RMT-OTHER-20150002_001 Unknown Unknown - - -
24.03.2015 17:40South Humber Bank Power Station - reduction in maximum output

From 1 April 2015 to 31 March 2017, the maximum output from South Humber Bank Power Station (comprising BMUs T_SHBA-1 and T_SHBA-2) will be reduced from 1285 MW to 540 MW. We may run T_SHBA-1 and/or T_SHBA-2 to generate up to 540 MW.

CE-RMT-OTHER-20150001_001 Unknown Unknown - - -

Disclaimer
Any disclosures that are set out on this page are made pursuant to Regulation (EU) 1227/2011. They are based on the information that is available at the time of publication and are provided on a reasonable endeavours basis. A notification will be made of any material changes to these disclosures. We accept no liability for the content should it subsequently be demonstrated to be inaccurate.

All existing REMIT messages and historical REMIT messages published prior to 12/12/2016 (UMM and SMM) will be presented in accordance with the standards and electronic formats described in REMIT Manual of Procedures on data reporting v3.0 (the Manual). Not all of the data fields in the historical REMIT messages will be populated due to the REMIT messages being published prior to the Manual requirements coming into force.

Back to news index