Publication (local time) | Message ID | Unavailability Type | Event Start (local time) | Estimated Event Stop (local time) | Asset | BMU | Bidding Zone | FuelType | Item | EMT Status | Event Status | Installed Capacity | Approximate Available Capacity | Approximate Unavailable Capacity | Unit | Unavailability Reason | Event Type | Market Participant | Market Participant Code |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
22.11.2019 09:39 | Unplanned | 22.11.2019 07:22 | 22.11.2019 08:22 | Kings Lynn | E_KLYN-A-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 390 | 0 | 390 | MW | Boiler | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
01.11.2019 15:03 | Planned | 11.11.2019 08:00 | 18.11.2019 18:00 | Kings Lynn | E_KLYN-A-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 390 | 0 | 390 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
24.10.2019 23:26 | Planned | 24.10.2019 21:00 | 24.10.2019 23:30 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
24.10.2019 16:43 | Planned | 24.10.2019 06:00 | 24.10.2019 17:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
15.10.2019 13:29 | Planned | 04.11.2019 08:00 | 11.11.2019 08:00 | Kings Lynn | E_KLYN-A-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 390 | 0 | 390 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
04.10.2019 21:59 | Planned | 06.10.2019 23:00 | 07.10.2019 20:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | - | - | Active | 240 | 120 | 120 | MW | Inspection/Overhaul | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
05.09.2019 12:31 | Planned | 30.09.2019 08:00 | 04.11.2019 08:00 | Kings Lynn | E_KLYN-A-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 390 | 0 | 390 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
16.08.2019 09:30 | Planned | 16.08.2019 09:27 | 16.08.2019 16:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
14.08.2019 14:13 | Planned | 13.08.2019 17:00 | 14.08.2019 14:30 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
13.08.2019 09:31 | Planned | 13.08.2019 10:30 | 13.08.2019 17:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
13.08.2019 09:14 | Planned | 31.07.2019 23:59 | 13.08.2019 10:30 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
07.08.2019 16:16 | Unplanned | 07.08.2019 15:55 | 07.08.2019 16:15 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | CANCELLED | Dismissed | 240 | 120 | 120 | MW | Forced Majeure | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
12.07.2019 15:43 | Planned | 26.08.2019 08:00 | 30.09.2019 08:00 | Kings Lynn | E_KLYN-A-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 390 | 0 | 390 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
25.06.2019 09:44 | Planned | 14.06.2019 22:32 | 31.07.2019 23:59 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
17.06.2019 15:37 | Unplanned | 17.06.2019 16:00 | 17.06.2019 17:59 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | - | - | Active | 240 | 120 | 120 | MW | Early End to Planned Outage | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
13.06.2019 10:28 | Planned | 17.06.2019 11:01 | 17.06.2019 17:59 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
12.06.2019 11:18 | Planned | 14.06.2019 22:32 | 17.06.2019 11:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
06.06.2019 12:10 | Planned | 22.07.2019 08:00 | 26.08.2019 08:00 | Kings Lynn | E_KLYN-A-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 390 | 0 | 390 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
22.05.2019 10:45 | Planned | 24.06.2019 23:00 | 22.07.2019 08:00 | Kings Lynn | E_KLYN-A-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 390 | 0 | 390 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
10.05.2019 08:42 | Unplanned | 09.05.2019 18:00 | 10.05.2019 08:34 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | - | - | Active | 240 | 110 | 130 | MW | Electrical | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
08.05.2019 07:55 | Unplanned | 09.05.2019 06:00 | 09.05.2019 18:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | - | CANCELLED | Dismissed | 240 | 0 | 240 | MW | Turbine | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
07.05.2019 16:10 | Planned | 01.06.2019 05:00 | 14.06.2019 22:31 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 240 | 0 | 240 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
02.05.2019 16:34 | Planned | 30.05.2019 09:58 | 24.06.2019 23:00 | Kings Lynn | E_KLYN-A-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 390 | 0 | 390 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
02.05.2019 10:51 | Planned | 27.03.2019 10:59 | 30.05.2019 09:58 | Kings Lynn | E_KLYN-A-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 390 | 0 | 390 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
29.04.2019 12:20 | Planned | 09.05.2019 06:00 | 09.05.2019 18:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 240 | 0 | 240 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
25.03.2019 09:53 | Planned | 05.03.2019 00:02 | 27.03.2019 10:58 | Kings Lynn | E_KLYN-A-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 390 | 0 | 390 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
04.03.2019 12:36 | Planned | 08.02.2019 06:00 | 05.03.2019 00:01 | Kings Lynn | E_KLYN-A-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 390 | 0 | 390 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
25.01.2019 12:31 | Planned | 30.01.2019 06:00 | 31.01.2019 00:00 | Kings Lynn | E_KLYN-A-1 | 10YGB----------A | Fossil Gas | Plant | CANCELLED | Dismissed | 390 | 0 | 390 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
27.12.2018 14:49 | Unplanned | 26.12.2018 17:46 | 27.12.2018 14:45 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | - | - | Active | 245 | 0 | 245 | MW | Turbine | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
23.10.2018 16:18 | Unplanned | 23.10.2018 16:18 | 24.10.2018 05:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | - | - | Active | 245 | 0 | 245 | MW | Turbine | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
19.09.2018 14:27 | Unplanned | 16.09.2018 23:30 | 19.09.2018 23:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | - | - | Active | 245 | 0 | 245 | MW | Early End to Planned Outage | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
17.09.2018 20:46 | Unplanned | 17.09.2018 22:00 | 18.09.2018 06:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | - | - | Active | 240 | 0 | 240 | MW | Fuel Supply | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
12.09.2018 14:13 | Unplanned | 12.09.2018 11:01 | 12.09.2018 15:31 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | - | - | Active | 240 | 0 | 240 | MW | Fuel Supply | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
30.08.2018 10:53 | Unplanned | 18.08.2018 06:00 | 18.08.2018 07:55 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | - | - | Active | 240 | 0 | 240 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
28.08.2018 12:02 | Unplanned | 29.08.2018 19:38 | 29.08.2018 23:43 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | - | - | Active | 240 | 230 | 10 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
09.08.2018 11:38 | Planned | 01.10.2018 23:30 | 04.10.2018 23:30 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | Plant | CANCELLED | Dismissed | 245 | 0 | 245 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
09.08.2018 11:29 | Planned | 16.09.2018 23:30 | 20.09.2018 23:30 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | GT | - | Active | 245 | 0 | 245 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
01.08.2018 14:09 | Planned | 31.12.2019 23:01 | 31.03.2020 23:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 245 | 0 | 245 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
22.06.2018 11:38 | Planned | 29.06.2018 05:01 | 29.06.2018 15:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 240 | 0 | 240 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
25.05.2018 20:03 | Unplanned | 25.05.2018 20:00 | 25.05.2018 22:30 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | - | - | Active | 245 | 140 | 105 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
20.05.2018 23:41 | Unplanned | 21.05.2018 06:00 | 21.05.2018 14:30 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | - | - | Active | 245 | 0 | 245 | MW | Boiler | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
18.05.2018 15:57 | Unplanned | 20.05.2018 21:00 | 21.05.2018 00:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | - | - | Active | 245 | 140 | 105 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
06.04.2018 21:59 | Unplanned | 06.04.2018 19:40 | 07.04.2018 13:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | - | - | Active | 245 | 0 | 245 | MW | Fuel Supply | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
06.04.2018 10:38 | Planned | 30.09.2019 23:01 | 31.12.2019 23:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 245 | 0 | 245 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
06.04.2018 10:36 | Planned | 30.06.2019 23:01 | 30.09.2019 23:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 245 | 0 | 245 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
06.04.2018 10:30 | Planned | 31.03.2019 23:00 | 30.06.2019 23:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 245 | 0 | 245 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
06.04.2018 10:29 | Planned | 31.03.2019 23:00 | 31.03.2020 22:59 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | Plant | CANCELLED | Dismissed | 245 | 245 | 0 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
05.04.2018 16:18 | Planned | 31.03.2020 22:00 | 07.04.2020 05:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | Plant | CANCELLED | Dismissed | 245 | 0 | 245 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
05.04.2018 16:17 | Planned | 17.09.2020 22:30 | 20.09.2020 22:30 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | Plant | CANCELLED | Dismissed | 245 | 0 | 245 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
05.04.2018 16:12 | Planned | 02.10.2019 23:30 | 05.10.2019 23:30 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | Plant | CANCELLED | Dismissed | 245 | 0 | 245 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
05.04.2018 16:10 | Planned | 01.05.2019 05:00 | 21.05.2019 05:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | Plant | CANCELLED | Dismissed | 245 | 0 | 245 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
03.04.2018 14:39 | Planned | 04.05.2018 22:30 | 21.05.2018 06:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 245 | 0 | 245 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
19.03.2018 16:59 | Planned | 30.08.2018 00:01 | 31.08.2018 23:59 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | CANCELLED | Dismissed | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
19.03.2018 16:51 | Planned | 04.06.2018 00:01 | 05.06.2018 23:59 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | CANCELLED | Dismissed | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
09.03.2018 13:01 | Planned | 09.04.2018 05:00 | 13.04.2018 23:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 240 | 0 | 240 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
07.03.2018 12:20 | Unplanned | 01.03.2018 17:12 | 07.03.2018 13:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | - | - | Active | 245 | 0 | 245 | MW | Boiler | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
01.03.2018 18:43 | Unplanned | 01.03.2018 18:43 | 01.03.2018 22:43 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | - | - | Active | 240 | 235 | 5 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
01.03.2018 09:37 | Unplanned | 01.03.2018 09:37 | 01.03.2018 13:34 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | - | - | Active | 245 | 0 | 245 | MW | Generator | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
15.01.2018 10:18 | Planned | 08.06.2018 22:30 | 29.06.2018 05:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 240 | 0 | 240 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
08.11.2017 09:53 | Unplanned | 01.01.2018 00:00 | 01.01.2018 00:01 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | - | CANCELLED | Dismissed | 240 | 0 | 240 | MW | Under Investigation | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
30.10.2017 17:08 | Unplanned | 30.10.2017 16:55 | 30.10.2017 20:55 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | - | - | Active | 240 | 0 | 240 | MW | Under Investigation | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
26.10.2017 08:42 | Planned | 31.10.2017 15:00 | 31.10.2017 18:00 | Lincs 2 | T_LNCSW-2 | 10YGB----------A | Wind Offshore | Plant | CANCELLED | Dismissed | 140 | 0 | 140 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
26.10.2017 08:41 | Planned | 31.10.2017 15:00 | 31.10.2017 18:00 | Lincs 1 | T_LNCSW-1 | 10YGB----------A | Wind Offshore | Plant | CANCELLED | Dismissed | 130 | 0 | 130 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
24.10.2017 12:40 | Unplanned | 25.10.2017 13:30 | 25.10.2017 16:30 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | - | - | Active | 240 | 120 | 120 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
24.10.2017 10:25 | Planned | 13.07.2018 00:01 | 16.07.2018 23:59 | Killingholme | T_KILNS-1 | 10YGB----------A | Fossil Gas | GT | CANCELLED | Dismissed | 665 | 443 | 222 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
20.10.2017 15:29 | Planned | 21.10.2017 21:00 | 22.10.2017 20:29 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 245 | 0 | 245 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
19.10.2017 09:52 | Unplanned | 19.10.2017 13:00 | 19.10.2017 17:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | - | - | Active | 245 | 245 | 0 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
18.10.2017 19:07 | Unplanned | 18.10.2017 19:00 | 19.10.2017 05:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | - | - | Active | 240 | 120 | 120 | MW | Generator | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
18.10.2017 19:03 | Planned | 19.10.2017 05:01 | 19.10.2017 19:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
18.10.2017 18:56 | Planned | 18.10.2017 10:01 | 19.10.2017 05:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
18.10.2017 17:41 | Unplanned | 18.10.2017 14:01 | 18.10.2017 22:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | - | CANCELLED | Dismissed | 240 | 120 | 120 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
18.10.2017 17:37 | Unplanned | 18.10.2017 14:01 | 18.10.2017 19:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | - | - | Active | 240 | 120 | 120 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
18.10.2017 10:03 | Unplanned | 18.10.2017 10:01 | 18.10.2017 14:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | - | - | Active | 240 | 120 | 120 | MW | Turbine | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
18.10.2017 09:59 | Unplanned | 18.10.2017 10:01 | 19.10.2017 05:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | - | - | Active | 240 | 120 | 120 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
16.10.2017 11:54 | Planned | 04.10.2017 05:01 | 18.10.2017 10:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
10.10.2017 15:08 | Unplanned | 10.10.2017 15:00 | 10.10.2017 16:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | - | - | Active | 245 | 245 | 0 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
27.09.2017 10:15 | Planned | 22.10.2017 20:30 | 28.10.2017 05:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 245 | 0 | 245 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
24.09.2017 22:08 | Unplanned | 24.09.2017 23:30 | 25.09.2017 00:30 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | - | - | Active | 245 | 90 | 155 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
13.09.2017 09:47 | Planned | 13.09.2017 20:45 | 14.09.2017 09:45 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | GT | - | Active | 905 | 452 | 453 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
01.09.2017 15:39 | Unplanned | 05.09.2017 14:01 | 07.09.2017 05:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | CANCELLED | Dismissed | 905 | 450 | 455 | MW | Boiler | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
01.09.2017 15:38 | Unplanned | 01.09.2017 05:00 | 05.09.2017 14:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | CANCELLED | Dismissed | 905 | 0 | 905 | MW | Boiler | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
30.08.2017 16:28 | Unplanned | 30.08.2017 18:00 | 31.08.2017 23:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | CANCELLED | Dismissed | 905 | 450 | 455 | MW | Boiler | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
30.08.2017 16:27 | Unplanned | 30.08.2017 12:07 | 31.08.2017 23:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 0 | 905 | MW | Boiler | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
29.08.2017 14:00 | Planned | 24.09.2017 23:01 | 04.10.2017 05:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
29.08.2017 10:31 | Planned | 26.08.2017 22:01 | 31.08.2017 22:59 | Humber Phase 1 | T_SHBA-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 810 | 0 | 810 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
29.08.2017 08:31 | Unplanned | 29.08.2017 08:31 | 29.08.2017 09:25 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 650 | 255 | MW | Turbine | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
28.08.2017 13:16 | Unplanned | 28.08.2017 13:15 | 28.08.2017 20:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 905 | 0 | MW | Early End to Planned Outage | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
27.08.2017 18:40 | Unplanned | 28.08.2017 00:35 | 28.08.2017 05:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 540 | 40 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
27.08.2017 17:15 | Unplanned | 27.08.2017 17:15 | 27.08.2017 18:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 540 | 40 | MW | Early End to Planned Outage | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
27.08.2017 15:09 | Unplanned | 27.08.2017 15:11 | 29.08.2017 12:00 | Humber Phase 1 | T_SHBA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 810 | 0 | 810 | MW | Turbine | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
27.08.2017 14:57 | Unplanned | 27.08.2017 15:10 | 27.08.2017 22:00 | Humber Phase 1 | T_SHBA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 810 | 810 | 0 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
27.08.2017 10:15 | Unplanned | 27.08.2017 08:01 | 27.08.2017 22:00 | Humber Phase 1 | T_SHBA-1 | 10YGB----------A | Fossil Gas | - | CANCELLED | Dismissed | 810 | 810 | 0 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
26.08.2017 15:29 | Unplanned | 26.08.2017 15:29 | 27.08.2017 08:00 | Humber Phase 1 | T_SHBA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 810 | 0 | 810 | MW | Turbine | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
26.08.2017 14:11 | Unplanned | 26.08.2017 14:08 | 26.08.2017 22:00 | Humber Phase 1 | T_SHBA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 810 | 810 | 0 | MW | Early End to Planned Outage | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
24.08.2017 17:12 | Planned | 26.08.2017 08:01 | 26.08.2017 22:00 | Humber Phase 1 | T_SHBA-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 810 | 0 | 810 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
24.08.2017 17:09 | Planned | 13.03.2017 23:00 | 26.08.2017 08:00 | Humber Phase 1 | T_SHBA-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 810 | 0 | 810 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
24.08.2017 09:19 | Planned | 27.08.2017 08:00 | 28.08.2017 20:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | GT | - | Active | 905 | 452 | 453 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
21.08.2017 06:56 | Unplanned | 21.08.2017 06:10 | 21.08.2017 06:55 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | CANCELLED | Dismissed | 905 | 905 | 0 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
21.08.2017 06:54 | Unplanned | 21.08.2017 06:10 | 21.08.2017 06:55 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 905 | 0 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
20.08.2017 22:20 | Unplanned | 20.08.2017 21:49 | 21.08.2017 03:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | CANCELLED | Dismissed | 905 | 905 | 0 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
20.08.2017 22:17 | Unplanned | 20.08.2017 21:49 | 21.08.2017 03:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 905 | 0 | MW | Early End to Planned Outage | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
17.08.2017 18:33 | Unplanned | 17.08.2017 18:30 | 17.08.2017 19:30 | Lincs 1 | T_LNCSW-1 | 10YGB----------A | Wind Offshore | - | CANCELLED | Dismissed | 130 | 130 | 0 | MW | Early End to Outage | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
16.08.2017 21:34 | Planned | 17.08.2017 12:40 | 17.08.2017 19:30 | Lincs 2 | T_LNCSW-2 | 10YGB----------A | Wind Offshore | Plant | - | Active | 140 | 0 | 140 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
16.08.2017 21:31 | Planned | 17.08.2017 18:01 | 17.08.2017 19:30 | Lincs 1 | T_LNCSW-1 | 10YGB----------A | Wind Offshore | Plant | - | Active | 130 | 0 | 130 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
16.08.2017 21:29 | Planned | 17.08.2017 12:40 | 17.08.2017 14:10 | Lincs 1 | T_LNCSW-1 | 10YGB----------A | Wind Offshore | Plant | - | Active | 130 | 0 | 130 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
16.08.2017 17:39 | Unplanned | 16.08.2017 17:31 | 16.08.2017 19:31 | Lincs 1 | T_LNCSW-1 | 10YGB----------A | Wind Offshore | - | - | Active | 130 | 0 | 130 | MW | Circuit Outage | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
16.08.2017 17:34 | Unplanned | 16.08.2017 18:01 | 16.08.2017 19:31 | Lincs 2 | T_LNCSW-2 | 10YGB----------A | Wind Offshore | - | - | Active | 140 | 0 | 140 | MW | Circuit Outage | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
16.08.2017 17:24 | Unplanned | 16.08.2017 17:00 | 16.08.2017 19:01 | Lincs 2 | T_LNCSW-2 | 10YGB----------A | Wind Offshore | - | CANCELLED | Dismissed | 140 | 0 | 140 | MW | Circuit Outage | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
16.08.2017 16:42 | Unplanned | 16.08.2017 16:00 | 16.08.2017 17:31 | Lincs 2 | T_LNCSW-2 | 10YGB----------A | Wind Offshore | - | - | Active | 140 | 140 | 0 | MW | Early End to Outage | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
16.08.2017 15:36 | Planned | 17.08.2017 16:00 | 17.08.2017 17:30 | Lincs 2 | T_LNCSW-2 | 10YGB----------A | Wind Offshore | Plant | CANCELLED | Dismissed | 140 | 0 | 140 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
16.08.2017 11:26 | Unplanned | 16.08.2017 10:31 | 16.08.2017 12:30 | Lincs 2 | T_LNCSW-2 | 10YGB----------A | Wind Offshore | - | - | Active | 140 | 0 | 140 | MW | Circuit Outage | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
15.08.2017 15:38 | Planned | 16.08.2017 09:00 | 16.08.2017 17:31 | Lincs 1 | T_LNCSW-1 | 10YGB----------A | Wind Offshore | Plant | - | Active | 130 | 0 | 130 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
15.08.2017 15:34 | Planned | 16.08.2017 16:00 | 16.08.2017 17:31 | Lincs 2 | T_LNCSW-2 | 10YGB----------A | Wind Offshore | Plant | - | Active | 140 | 0 | 140 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
15.08.2017 15:29 | Planned | 16.08.2017 09:00 | 16.08.2017 10:31 | Lincs 2 | T_LNCSW-2 | 10YGB----------A | Wind Offshore | Plant | - | Active | 140 | 0 | 140 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
15.08.2017 14:54 | Planned | 16.08.2017 08:00 | 16.08.2017 16:00 | Lincs 1 | T_LNCSW-1 | 10YGB----------A | Wind Offshore | Plant | CANCELLED | Dismissed | 130 | 77 | 53 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
15.08.2017 14:11 | Planned | 25.08.2017 23:00 | 27.08.2017 18:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | Plant | - | Active | 580 | 0 | 580 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
15.08.2017 13:19 | Unplanned | 14.08.2017 19:20 | 16.08.2017 15:30 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | - | - | Active | 245 | 0 | 245 | MW | Boiler | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
14.08.2017 14:41 | Planned | 15.08.2017 06:30 | 15.08.2017 18:00 | Lincs 2 | T_LNCSW-2 | 10YGB----------A | Wind Offshore | - | - | Active | 140 | -3 | 143 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
14.08.2017 14:40 | Planned | 15.08.2017 06:30 | 15.08.2017 18:00 | Lincs 1 | T_LNCSW-1 | 10YGB----------A | Wind Offshore | - | - | Active | 130 | -3 | 133 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
07.08.2017 18:17 | Unplanned | 07.08.2017 18:15 | 07.08.2017 19:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 540 | 40 | MW | Early End to Planned Outage | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
04.08.2017 18:17 | Unplanned | 04.08.2017 18:15 | 04.08.2017 20:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 905 | 0 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
31.07.2017 16:01 | Planned | 31.08.2017 23:00 | 01.09.2017 05:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | Plant | - | Active | 580 | 0 | 580 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
31.07.2017 15:58 | Planned | 31.08.2017 23:00 | 01.09.2017 05:00 | Humber Phase 1 | T_SHBA-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 810 | 0 | 810 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
31.07.2017 15:53 | Planned | 31.08.2017 23:00 | 01.09.2017 05:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 905 | 0 | 905 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
31.07.2017 13:23 | Planned | 17.08.2017 21:00 | 21.08.2017 03:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 905 | 0 | 905 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
28.07.2017 05:01 | Unplanned | 28.07.2017 04:58 | 28.07.2017 07:40 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 905 | 0 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
27.07.2017 03:24 | Unplanned | 27.07.2017 03:20 | 27.07.2017 06:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 540 | 40 | MW | Early End to Planned Outage | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
25.07.2017 16:18 | Planned | 26.07.2017 22:00 | 27.07.2017 06:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | GT | - | Active | 580 | 290 | 290 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
24.07.2017 12:49 | Planned | 31.07.2017 07:00 | 31.07.2017 18:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | GT | - | Active | 580 | 290 | 290 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
24.07.2017 12:48 | Planned | 28.07.2017 08:00 | 07.08.2017 18:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | GT | - | Active | 580 | 290 | 290 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
20.07.2017 20:19 | Unplanned | 20.07.2017 20:15 | 20.07.2017 23:59 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 540 | 40 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
20.07.2017 04:36 | Unplanned | 20.07.2017 05:55 | 20.07.2017 07:30 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 85 | 495 | MW | Turbine | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
16.07.2017 12:07 | Unplanned | 16.07.2017 12:04 | 16.07.2017 15:33 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 905 | 0 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
12.07.2017 15:23 | Planned | 11.06.2017 23:00 | 19.07.2017 23:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | Plant | - | Active | 580 | 0 | 580 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
03.07.2017 18:06 | Planned | 21.08.2017 00:02 | 24.09.2017 23:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
02.07.2017 10:01 | Unplanned | 02.07.2017 12:00 | 02.07.2017 16:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 905 | 0 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
30.06.2017 00:07 | Unplanned | 30.06.2017 00:06 | 30.06.2017 06:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 835 | 70 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
29.06.2017 00:00 | Unplanned | 28.06.2017 23:59 | 30.06.2017 05:30 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 408 | 497 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
28.06.2017 21:25 | Unplanned | 28.06.2017 21:00 | 30.06.2017 06:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 452 | 453 | MW | Early End to Planned Outage | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
28.06.2017 10:26 | Planned | 28.06.2017 21:00 | 30.06.2017 06:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | GT | - | Active | 905 | 452 | 453 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
25.06.2017 23:56 | Unplanned | 26.06.2017 01:30 | 26.06.2017 12:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 810 | 95 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
22.06.2017 16:03 | Unplanned | 23.06.2017 02:00 | 23.06.2017 05:30 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 250 | 655 | MW | Testing - Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
21.06.2017 12:38 | Planned | 28.06.2017 06:30 | 28.06.2017 13:29 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
21.06.2017 04:27 | Unplanned | 21.06.2017 04:25 | 21.06.2017 23:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 905 | 0 | MW | Early End to Planned Outage | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
20.06.2017 14:57 | Planned | 28.06.2017 13:30 | 28.06.2017 15:30 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
19.06.2017 10:59 | Planned | 14.06.2017 08:01 | 21.06.2017 23:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 905 | 0 | 905 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
16.06.2017 11:49 | Planned | 16.06.2017 23:00 | 17.06.2017 04:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 245 | 0 | 245 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
14.06.2017 14:05 | Planned | 15.06.2017 19:31 | 16.06.2017 03:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 245 | 0 | 245 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
14.06.2017 14:01 | Planned | 15.06.2017 18:30 | 15.06.2017 19:30 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 245 | 0 | 245 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
13.06.2017 15:48 | Planned | 13.06.2017 19:31 | 14.06.2017 04:15 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 245 | 0 | 245 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
12.06.2017 10:53 | Planned | 12.06.2017 22:30 | 13.06.2017 19:30 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 245 | 0 | 245 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
08.06.2017 15:21 | Planned | 28.03.2017 16:00 | 14.06.2017 08:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 905 | 0 | 905 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
26.05.2017 13:21 | Planned | 30.05.2017 23:30 | 02.06.2017 05:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | GT | - | Active | 245 | 0 | 245 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
23.05.2017 10:29 | Planned | 24.05.2017 23:00 | 26.05.2017 23:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | GT | CANCELLED | Dismissed | 245 | 0 | 245 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
16.05.2017 11:02 | Unplanned | 16.05.2017 11:05 | 16.05.2017 11:50 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 220 | 360 | MW | Turbine | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
12.05.2017 17:10 | Unplanned | 12.05.2017 19:30 | 13.05.2017 05:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | - | CANCELLED | Dismissed | 245 | 225 | 20 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
11.05.2017 17:21 | Unplanned | 11.05.2017 19:30 | 12.05.2017 05:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | - | CANCELLED | Dismissed | 245 | 225 | 20 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
11.05.2017 17:19 | Planned | 07.05.2017 23:00 | 12.05.2017 19:30 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | GT | - | Active | 245 | 0 | 245 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
09.05.2017 18:31 | Unplanned | 10.05.2017 19:30 | 11.05.2017 05:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | - | CANCELLED | Dismissed | 245 | 225 | 20 | MW | Commissioning- Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
06.05.2017 11:16 | Unplanned | 06.05.2017 11:14 | 06.05.2017 12:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 540 | 40 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
01.05.2017 11:48 | Unplanned | 01.05.2017 12:00 | 01.05.2017 17:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 540 | 40 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
22.04.2017 14:25 | Unplanned | 22.04.2017 14:23 | 22.04.2017 20:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 540 | 40 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
19.04.2017 12:24 | Unplanned | 19.04.2017 12:15 | 19.04.2017 14:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 550 | 30 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
14.04.2017 14:40 | Unplanned | 14.04.2017 14:36 | 14.04.2017 23:59 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 540 | 40 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
13.04.2017 18:01 | Unplanned | 13.04.2017 09:47 | 13.04.2017 19:30 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 270 | 310 | MW | Turbine | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
10.04.2017 13:02 | Unplanned | 10.04.2017 13:30 | 10.04.2017 18:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | - | - | Active | 245 | 0 | 245 | MW | Boiler | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
03.04.2017 11:08 | Planned | 31.05.2017 05:00 | 02.06.2017 23:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
01.04.2017 16:27 | Unplanned | 01.04.2017 16:27 | 02.04.2017 23:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | - | - | Active | 245 | 245 | 0 | MW | Early End to Planned Outage | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
01.04.2017 08:30 | Unplanned | 01.04.2017 08:40 | 01.04.2017 09:10 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 385 | 195 | MW | Turbine | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
29.03.2017 16:48 | Planned | 27.03.2017 22:00 | 28.03.2017 06:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
29.03.2017 16:48 | Unplanned | 24.03.2017 05:12 | 27.03.2017 14:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 452 | 453 | MW | Turbine | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
24.03.2017 09:56 | Planned | 29.03.2017 22:00 | 30.03.2017 06:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
24.03.2017 09:56 | Planned | 27.03.2017 22:00 | 28.03.2017 06:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
24.03.2017 09:56 | Planned | 28.03.2017 22:00 | 29.03.2017 06:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
24.03.2017 09:01 | Unplanned | 24.03.2017 05:12 | 27.03.2017 14:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 452 | 453 | MW | Turbine | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
23.03.2017 17:18 | Unplanned | 24.03.2017 04:00 | 24.03.2017 05:30 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 905 | 0 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
21.03.2017 17:51 | Unplanned | 21.03.2017 17:40 | 22.03.2017 00:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 905 | 0 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
21.03.2017 09:36 | Unplanned | 21.03.2017 09:33 | 21.03.2017 11:30 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 30 | 875 | MW | Generator | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
21.03.2017 08:35 | Unplanned | 21.03.2017 09:40 | 21.03.2017 12:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 408 | 497 | MW | Turbine | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
20.03.2017 11:02 | Unplanned | 28.03.2017 14:00 | 28.03.2017 16:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 165 | 740 | MW | Testing - Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
20.03.2017 10:37 | Planned | 27.03.2017 14:00 | 28.03.2017 15:59 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | GT | - | Active | 905 | 452 | 453 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
18.03.2017 00:49 | Unplanned | 18.03.2017 00:47 | 18.03.2017 01:36 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 905 | 0 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
17.03.2017 14:53 | Planned | 21.04.2017 22:00 | 21.08.2017 00:01 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
12.03.2017 15:02 | Unplanned | 12.03.2017 15:00 | 12.03.2017 18:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 540 | 40 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
11.03.2017 08:23 | Unplanned | 11.03.2017 08:25 | 11.03.2017 09:30 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 330 | 250 | MW | Turbine | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
10.03.2017 11:23 | Unplanned | 10.03.2017 11:25 | 10.03.2017 13:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 540 | 40 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
08.03.2017 20:06 | Unplanned | 08.03.2017 20:04 | 08.03.2017 21:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 540 | 40 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
08.03.2017 07:54 | Unplanned | 08.03.2017 13:00 | 08.03.2017 16:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 540 | 40 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
08.03.2017 00:47 | Unplanned | 07.03.2017 22:50 | 08.03.2017 16:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | CANCELLED | Dismissed | 580 | 0 | 580 | MW | Generator | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
06.03.2017 13:36 | Planned | 08.03.2017 13:00 | 08.03.2017 16:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | GT | - | Active | 580 | 290 | 290 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
04.03.2017 01:42 | Unplanned | 09.03.2017 08:00 | 09.03.2017 15:00 | South Humber Bank 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | Plant | - | Active | 580 | 540 | 40 | MW | Commissioning - Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
02.03.2017 07:30 | Unplanned | 02.03.2017 07:29 | 02.03.2017 11:30 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | - | - | Active | 245 | 0 | 245 | MW | Boiler | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
28.02.2017 16:58 | Unplanned | 02.03.2017 08:00 | 02.03.2017 12:00 | Humber Phase 1 | T_SHBA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 810 | 65 | 745 | MW | Testing - Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
22.02.2017 10:23 | Unplanned | 22.02.2017 10:15 | 22.02.2017 15:05 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 905 | 0 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
21.02.2017 09:56 | Planned | 30.08.2017 00:01 | 31.08.2017 23:59 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | CANCELLED | Dismissed | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
18.02.2017 01:45 | Unplanned | 18.02.2017 01:46 | 18.02.2017 09:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 700 | 205 | MW | Turbine | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
08.02.2017 15:43 | Planned | 27.03.2017 06:00 | 02.04.2017 23:00 | Barry | E_BRYP-1 | 10YGB----------A | Fossil Gas | Plant | - | Active | 245 | 0 | 245 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
07.02.2017 11:01 | Planned | 08.02.2017 21:30 | 09.02.2017 23:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
07.02.2017 11:00 | Planned | 08.02.2017 21:30 | 09.02.2017 23:00 | Peterborough | E_PETEM1 | 10YGB----------A | Fossil Gas | GT | - | Active | 240 | 120 | 120 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
05.02.2017 22:24 | Unplanned | 02.02.2017 08:56 | 06.02.2017 02:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 0 | 580 | MW | Turbine | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
05.02.2017 18:12 | Unplanned | 05.02.2017 17:32 | 06.02.2017 04:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 905 | 0 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
03.02.2017 09:57 | Unplanned | 03.02.2017 05:35 | 03.02.2017 22:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 410 | 495 | MW | Boiler | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
02.02.2017 16:52 | Planned | 04.02.2017 14:00 | 04.02.2017 18:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | GT | CANCELLED | Dismissed | 580 | 290 | 290 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
02.02.2017 16:51 | Planned | 04.02.2017 06:00 | 04.02.2017 14:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | Plant | CANCELLED | Dismissed | 580 | 0 | 580 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
02.02.2017 10:11 | Unplanned | 02.02.2017 09:58 | 02.02.2017 14:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 540 | 40 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
31.01.2017 14:06 | Planned | 31.01.2017 23:00 | 01.02.2017 06:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | GT | - | Active | 905 | 452 | 453 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
26.01.2017 10:07 | Planned | 28.03.2017 21:00 | 27.05.2017 21:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | GT | CANCELLED | Dismissed | 905 | 452 | 453 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
26.01.2017 10:05 | Planned | 28.03.2017 21:00 | 27.05.2017 21:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | GT | CANCELLED | Dismissed | 905 | 452 | 453 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
24.01.2017 10:24 | Unplanned | 24.01.2017 10:30 | 24.01.2017 13:45 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 530 | 50 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
21.01.2017 17:49 | Unplanned | 21.01.2017 17:45 | 21.01.2017 18:15 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 250 | 330 | MW | Boiler | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
20.01.2017 11:59 | Unplanned | 20.01.2017 11:55 | 20.01.2017 12:30 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 540 | 40 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
19.01.2017 08:09 | Unplanned | 19.01.2017 13:30 | 19.01.2017 14:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 540 | 40 | MW | Testing - Variable Output | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
07.01.2017 22:43 | Unplanned | 07.01.2017 22:41 | 08.01.2017 16:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 540 | 40 | MW | Outage Ends | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
07.01.2017 08:57 | Unplanned | 07.01.2016 08:05 | 07.01.2016 12:05 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | CANCELLED | Dismissed | 580 | 263 | 317 | MW | Turbine | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
30.12.2016 11:18 | Unplanned | 30.12.2016 11:16 | 30.12.2016 23:00 | Humber Phase 2 | T_SHBA-2 | 10YGB----------A | Fossil Gas | - | - | Active | 580 | 540 | 40 | MW | Early End to Planned Outage | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
28.12.2016 10:17 | Planned | 23.12.2016 23:00 | 03.01.2017 12:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | GT | CANCELLED | Dismissed | 905 | 452 | 453 | MW | Planned | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
13.12.2016 17:26 | Unplanned | 11.12.2016 20:00 | 15.12.2016 23:59 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 452 | 453 | MW | Boiler | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
13.12.2016 17:14 | Unplanned | 14.12.2016 21:00 | 15.12.2016 05:00 | Langage | T_LAGA-1 | 10YGB----------A | Fossil Gas | - | - | Active | 905 | 0 | 905 | MW | Boiler | Production unavailability | British Gas Trading Ltd | 21X000000001111W | |
11.12.2016 15:01 | Unplanned | 11.12.2016 07:10 | 11.12.2016 20:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 0 | 905 | MW | Cooling Systems | - | - | - | |
09.12.2016 15:34 | Unplanned | 09.12.2016 15:31 | 09.12.2016 17:30 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 530 | 50 | MW | Outage Ends | - | - | - | |
09.12.2016 09:11 | Planned | 10.12.2016 06:00 | 10.12.2016 14:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | Plant | CANCELLED | Dismissed | 580 | 0 | 580 | MW | Planned | - | - | - | |
08.12.2016 17:04 | Planned | 15.12.2016 06:00 | 15.12.2016 15:30 | Peterborough | E_PETEM1 | - | Fossil Gas | Plant | - | Active | 240 | 0 | 240 | MW | Planned | Production Unavailability | British Gas Trading Ltd | 21X000000001111W | |
06.12.2016 13:49 | Planned | 24.12.2016 23:00 | 30.12.2016 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | Plant | - | Active | 580 | 0 | 580 | MW | Planned | Production Unavailability | British Gas Trading Ltd | 21X000000001111W | |
01.12.2016 13:07 | Unplanned | 30.11.2016 03:33 | 01.12.2016 15:00 | Barry | E_BRYP-1 | - | Fossil Gas | - | - | - | 245 | 0 | 245 | MW | Generator | - | - | - | |
29.11.2016 06:04 | Unplanned | 29.11.2016 06:02 | 29.11.2016 08:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 547 | 358 | MW | Turbine | - | - | - | |
29.11.2016 03:01 | Unplanned | 29.11.2016 03:00 | 29.11.2016 06:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 905 | 0 | MW | Outage Ends | - | - | - | |
28.11.2016 10:08 | Unplanned | 28.11.2016 10:06 | 28.11.2016 11:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 425 | 480 | MW | Boiler | - | - | - | |
27.11.2016 22:49 | Unplanned | 27.11.2016 14:56 | 27.11.2016 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 422 | 483 | MW | Turbine | - | - | - | |
26.11.2016 13:38 | Unplanned | 26.11.2016 14:00 | 26.11.2016 15:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 452 | 453 | MW | Turbine | - | - | - | |
25.11.2016 15:08 | Planned | 24.11.2016 14:43 | 26.11.2016 14:00 | Langage | T_LAGA-1 | - | Fossil Gas | GT | - | - | 905 | 452 | 453 | MW | Planned | - | - | - | |
24.11.2016 11:40 | Unplanned | 24.11.2016 11:37 | 24.11.2016 21:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 852 | 53 | MW | Outage Ends | - | - | - | |
13.11.2016 21:50 | Unplanned | 14.11.2016 01:00 | 14.11.2016 02:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 380 | 525 | MW | Testing - Variable Output | - | - | - | |
13.11.2016 21:30 | Unplanned | 13.11.2016 07:54 | 14.11.2016 01:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 410 | 495 | MW | Turbine | - | - | - | |
06.11.2016 20:40 | Unplanned | 06.11.2016 20:35 | 06.11.2016 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 905 | 0 | MW | Early End to Planned Outage | - | - | - | |
03.11.2016 12:27 | Planned | 04.11.2016 20:00 | 06.11.2016 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | GT | - | - | 905 | 452 | 453 | MW | Planned | - | - | - | |
30.10.2016 12:33 | Unplanned | 30.10.2016 12:29 | 30.10.2016 18:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 540 | 270 | MW | Early End to Planned Outage | - | - | - | |
28.10.2016 15:32 | Planned | 30.10.2016 08:00 | 30.10.2016 18:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | GT | - | - | 810 | 540 | 270 | MW | Planned | - | - | - | |
28.10.2016 13:05 | Unplanned | 28.10.2016 13:02 | 28.10.2016 15:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 530 | 50 | MW | Outage Ends | - | - | - | |
27.10.2016 19:52 | Unplanned | 27.10.2016 19:49 | 27.10.2016 23:00 | Peterborough | E_PETEM1 | - | Fossil Gas | - | - | - | 240 | 120 | 120 | MW | Outage Ends | - | - | - | |
26.10.2016 17:30 | Planned | 26.10.2016 23:01 | 27.10.2016 23:00 | Peterborough | E_PETEM1 | - | Fossil Gas | GT | - | - | 240 | 120 | 120 | MW | Planned | - | - | - | |
26.10.2016 16:33 | Unplanned | 27.10.2016 10:00 | 27.10.2016 15:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 520 | 60 | MW | Testing - Variable Output | - | - | - | |
17.10.2016 09:44 | Planned | 18.10.2016 21:00 | 22.10.2016 06:00 | Langage | T_LAGA-1 | - | Fossil Gas | Plant | CANCELLED | Dismissed | 905 | 0 | 905 | MW | Planned | - | - | - | |
12.10.2016 22:08 | Planned | 19.05.2017 00:01 | 22.05.2017 23:59 | Killingholme | T_KILNS-1 | - | Fossil Gas | GT | CANCELLED | Dismissed | 665 | 443 | 222 | MW | Planned | Production Unavailability | British Gas Trading Ltd | 21X000000001111W | |
12.10.2016 22:06 | Planned | 04.11.2016 00:01 | 07.11.2016 23:59 | Killingholme | T_KILNS-1 | - | Fossil Gas | GT | CANCELLED | Dismissed | 665 | 443 | 222 | MW | Planned | - | - | - | |
12.10.2016 15:51 | Planned | 01.10.2016 23:00 | 14.10.2016 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | Plant | - | - | 810 | 0 | 810 | MW | Planned | - | - | - | |
09.10.2016 13:41 | Unplanned | 09.10.2016 15:00 | 09.10.2016 18:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | - | - | MW | Commissioning- Variable Output | - | - | - | |
08.10.2016 11:15 | Unplanned | 08.10.2016 12:30 | 08.10.2016 17:30 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | - | - | MW | Commissioning- Variable Output | - | - | - | |
07.10.2016 19:20 | Unplanned | 07.10.2016 19:20 | 07.10.2016 21:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 905 | 0 | MW | Outage Ends | - | - | - | |
07.10.2016 12:54 | Planned | 06.10.2016 22:00 | 08.10.2016 22:00 | Langage | T_LAGA-1 | - | Fossil Gas | Plant | CANCELLED | Dismissed | 905 | 0 | 905 | MW | Planned | - | - | - | |
07.10.2016 11:14 | Planned | 31.03.2018 05:00 | 13.04.2018 22:00 | Barry | E_BRYP-1 | - | Fossil Gas | Plant | CANCELLED | Dismissed | 245 | 0 | 245 | MW | Planned | Production Unavailability | British Gas Trading Ltd | 21X000000001111W | |
07.10.2016 11:09 | Planned | 03.08.2019 00:01 | 04.08.2019 23:59 | Peterborough | E_PETEM1 | - | Fossil Gas | GT | CANCELLED | Dismissed | 240 | 120 | 120 | MW | Planned | Production Unavailability | British Gas Trading Ltd | 21X000000001111W | |
07.10.2016 11:08 | Planned | 01.06.2019 00:01 | 02.06.2019 23:59 | Peterborough | E_PETEM1 | - | Fossil Gas | GT | CANCELLED | Dismissed | 240 | 120 | 120 | MW | Planned | Production Unavailability | British Gas Trading Ltd | 21X000000001111W | |
06.10.2016 18:26 | Planned | 11.10.2016 21:30 | 12.10.2016 06:00 | Peterborough | E_PETEM1 | - | Fossil Gas | Plant | - | - | 240 | 0 | 240 | MW | Planned | - | - | - | |
06.10.2016 18:21 | Planned | 10.10.2016 21:30 | 11.10.2016 06:00 | Peterborough | E_PETEM1 | - | Fossil Gas | Plant | - | - | 240 | 0 | 240 | MW | Planned | - | - | - | |
06.10.2016 15:38 | Planned | 11.10.2016 21:00 | 12.10.2016 06:00 | Peterborough | E_PETEM1 | - | Fossil Gas | Plant | - | - | 240 | 0 | 240 | MW | Planned | - | - | - | |
06.10.2016 14:23 | Unplanned | 06.10.2016 14:20 | 06.10.2016 16:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 830 | 75 | MW | Outage Ends | - | - | - | |
05.10.2016 14:44 | Unplanned | 05.10.2016 21:30 | 05.10.2016 22:30 | Barry | E_BRYP-1 | - | Fossil Gas | - | - | - | 245 | - | - | MW | Commissioning- Variable Output | - | - | - | |
04.10.2016 17:04 | Unplanned | 04.10.2016 20:42 | 04.10.2016 23:59 | Peterborough | E_PETEM1 | - | Fossil Gas | - | - | - | 240 | 230 | 10 | MW | Outage Ends | - | - | - | |
03.10.2016 10:39 | Unplanned | 03.10.2016 10:37 | 03.10.2016 13:37 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | CANCELLED | Dismissed | 580 | 260 | 320 | MW | Under Investigation | - | - | - | |
03.10.2016 09:37 | Unplanned | 03.10.2016 09:37 | 03.10.2016 10:37 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 0 | 580 | MW | Boiler | - | - | - | |
03.10.2016 06:52 | Unplanned | 03.10.2016 06:30 | 03.10.2016 07:15 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 400 | 505 | MW | Boiler | - | - | - | |
02.10.2016 18:05 | Unplanned | 02.10.2016 18:02 | 02.10.2016 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 805 | 100 | MW | Outage Ends | - | - | - | |
01.10.2016 15:27 | Unplanned | 01.10.2016 15:25 | 01.10.2016 17:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 540 | 40 | MW | Outage Ends | - | - | - | |
30.09.2016 12:53 | Unplanned | 30.09.2016 12:49 | 30.09.2016 13:50 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 0 | 905 | MW | Turbine | - | - | - | |
29.09.2016 17:08 | Unplanned | 27.09.2016 23:59 | 30.09.2016 11:00 | Barry | E_BRYP-1 | - | Fossil Gas | - | - | - | 245 | 0 | 245 | MW | Turbine | - | - | - | |
29.09.2016 09:56 | Planned | 26.10.2016 06:00 | 26.10.2016 23:00 | Peterborough | E_PETEM1 | - | Fossil Gas | Plant | - | - | 240 | 0 | 240 | MW | Planned | - | - | - | |
28.09.2016 18:23 | Unplanned | 29.09.2016 19:00 | 30.09.2016 02:00 | Barry | E_BRYP-1 | - | Fossil Gas | - | CANCELLED | Dismissed | 245 | - | - | MW | Commissioning- Variable Output | - | - | - | |
24.09.2016 10:33 | Unplanned | 24.09.2016 10:26 | 24.09.2016 11:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 905 | 0 | MW | Outage Ends | - | - | - | |
23.09.2016 12:14 | Planned | 18.07.2016 23:01 | 27.09.2016 23:59 | Barry | E_BRYP-1 | - | Fossil Gas | Plant | - | - | 245 | 0 | 245 | MW | Planned | - | - | - | |
13.09.2016 07:56 | Planned | 04.10.2016 05:00 | 04.10.2016 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | Plant | CANCELLED | Dismissed | 810 | 0 | 810 | MW | Planned | - | - | - | |
12.09.2016 10:56 | Unplanned | 12.09.2016 10:55 | 12.09.2016 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 905 | 0 | MW | Outage Ends | - | - | - | |
10.09.2016 12:56 | Unplanned | 10.09.2016 05:15 | 10.09.2016 14:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 398 | 507 | MW | 5 - Under Investigation | - | - | - | |
09.09.2016 15:29 | Unplanned | 09.09.2016 15:22 | 09.09.2016 16:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 540 | 270 | MW | Outage Ends | - | - | - | |
09.09.2016 11:09 | Unplanned | 09.09.2016 13:00 | 09.09.2016 14:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 450 | 455 | MW | Generator | - | - | - | |
08.09.2016 18:14 | Unplanned | 08.09.2016 18:00 | 09.09.2016 18:00 | Lincs 2 | T_LNCSW-2 | - | Wind Offshore | - | - | - | 140 | 140 | 0 | MW | Early End to Outage | - | - | - | |
08.09.2016 18:12 | Unplanned | 08.09.2016 18:00 | 09.09.2016 18:00 | Lincs 1 | T_LNCSW-1 | - | Wind Offshore | - | - | - | 130 | 129 | 1 | MW | Early End to Outage | - | - | - | |
08.09.2016 10:21 | Unplanned | 08.09.2016 14:11 | 08.09.2016 16:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 250 | 655 | MW | Generator | - | - | - | |
07.09.2016 20:28 | Unplanned | 07.09.2016 21:00 | 07.09.2016 21:30 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 600 | 305 | MW | Turbine | - | - | - | |
07.09.2016 20:22 | Unplanned | 07.09.2016 20:30 | 07.09.2016 21:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 400 | 505 | MW | Turbine | - | - | - | |
07.09.2016 19:24 | Unplanned | 07.09.2016 19:24 | 07.09.2016 20:30 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 170 | 735 | MW | Turbine | - | - | - | |
31.08.2016 10:51 | Planned | 03.09.2016 23:00 | 11.09.2016 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | Plant | - | - | 580 | 0 | 580 | MW | Planned | - | - | - | |
31.08.2016 10:46 | Planned | 05.09.2016 05:00 | 05.09.2016 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | Plant | CANCELLED | Dismissed | 580 | 0 | 580 | MW | Planned | - | - | - | |
28.08.2016 14:21 | Unplanned | 28.08.2016 14:20 | 28.08.2016 17:00 | Lincs 2 | T_LNCSW-2 | - | Wind Offshore | - | - | - | 140 | 140 | 0 | MW | Outage Ends | - | - | - | |
28.08.2016 13:09 | Unplanned | 28.08.2016 13:00 | 28.08.2016 17:00 | Lincs 1 | T_LNCSW-1 | - | Wind Offshore | - | - | - | 130 | 130 | 0 | MW | Outage Ends | - | - | - | |
24.08.2016 10:09 | Unplanned | 24.08.2016 05:18 | 24.08.2016 11:30 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 0 | 810 | MW | Turbine | - | - | - | |
21.08.2016 10:27 | Planned | 06.09.2016 06:00 | 09.09.2016 18:00 | Lincs 1 | T_LNCSW-1 | - | Wind Offshore | Plant | CANCELLED | Dismissed | 130 | 0 | 130 | MW | Planned | - | - | - | |
21.08.2016 10:16 | Planned | 06.09.2016 06:00 | 09.09.2016 18:00 | Lincs 1 | T_LNCSW-1 | - | Wind Offshore | Plant | - | - | 130 | 0 | 130 | MW | Planned | - | - | - | |
21.08.2016 10:13 | Planned | 06.09.2016 06:00 | 09.09.2016 18:00 | Lincs 2 | T_LNCSW-2 | - | Wind Offshore | Plant | - | - | 140 | 0 | 140 | MW | Planned | - | - | - | |
19.08.2016 14:01 | Planned | 20.08.2016 07:00 | 20.08.2016 13:00 | Langage | T_LAGA-1 | - | Fossil Gas | GT | - | - | 905 | 452 | 453 | MW | Planned | - | - | - | |
17.08.2016 18:35 | Unplanned | 17.08.2016 18:30 | 17.08.2016 20:39 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 905 | 0 | MW | Outage Ends | - | - | - | |
16.08.2016 09:16 | Unplanned | 16.08.2016 09:15 | 16.08.2016 10:52 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 540 | 40 | MW | Outage Ends | - | - | - | |
16.08.2016 00:10 | Unplanned | 15.08.2016 23:59 | 16.08.2016 08:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 905 | 0 | MW | Outage Ends | - | - | - | |
15.08.2016 21:55 | Unplanned | 16.08.2016 22:00 | 17.08.2016 06:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 250 | 330 | MW | Turbine | - | - | - | |
15.08.2016 07:04 | Unplanned | 15.08.2016 07:05 | 15.08.2016 08:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 355 | 550 | MW | Turbine | - | - | - | |
14.08.2016 16:55 | Unplanned | 14.08.2016 16:30 | 14.08.2016 17:30 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 220 | 590 | MW | Turbine | - | - | - | |
13.08.2016 19:58 | Unplanned | 13.08.2016 23:00 | 15.08.2016 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 540 | 270 | MW | Station Limit | - | - | - | |
13.08.2016 19:54 | Unplanned | 13.08.2016 23:00 | 15.08.2016 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 0 | 580 | MW | Station Limit | - | - | - | |
13.08.2016 19:50 | Unplanned | 13.08.2016 23:00 | 15.08.2016 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 0 | 580 | MW | Turbine | - | - | - | |
13.08.2016 19:38 | Unplanned | 13.08.2016 23:00 | 14.08.2016 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 540 | 40 | MW | Outage Ends | - | - | - | |
10.08.2016 07:13 | Unplanned | 10.08.2016 07:15 | 10.08.2016 08:15 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 480 | 425 | MW | Turbine | - | - | - | |
05.08.2016 18:19 | Unplanned | 05.08.2016 18:00 | 05.08.2016 21:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | Dismissed | 905 | 905 | 0 | MW | Early End to Planned Outage | - | - | - | |
05.08.2016 16:11 | Planned | 12.08.2016 23:00 | 21.08.2016 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | Plant | CANCELLED | Dismissed | 810 | 0 | 810 | MW | Planned | - | - | - | |
04.08.2016 15:40 | Planned | 15.09.2016 23:30 | 18.09.2016 23:30 | Barry | E_BRYP-1 | - | Fossil Gas | Plant | CANCELLED | Dismissed | 245 | 0 | 245 | MW | Planned | - | - | - | |
03.08.2016 17:03 | Unplanned | 26.07.2016 04:13 | 04.08.2016 09:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 0 | 905 | MW | Turbine | - | - | - | |
03.08.2016 15:50 | Unplanned | 04.08.2016 12:00 | 05.08.2016 21:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | CANCELLED | Dismissed | 905 | - | - | MW | Commissioning- Variable Output | - | - | - | |
03.08.2016 13:35 | Unplanned | 04.08.2016 23:00 | 07.08.2016 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | CANCELLED | Dismissed | 580 | - | - | MW | Commissioning- Variable Output | - | - | - | |
03.08.2016 13:25 | Unplanned | 08.08.2016 23:00 | 23.08.2016 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 540 | 40 | MW | Station Limit | - | - | - | |
03.08.2016 13:19 | Unplanned | 08.08.2016 23:00 | 23.08.2016 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 0 | 810 | MW | Station Limit | - | - | - | |
03.08.2016 12:42 | Planned | 11.04.2016 23:00 | 08.08.2016 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | Plant | - | - | 580 | 0 | 580 | MW | Planned | - | - | - | |
01.08.2016 12:49 | Unplanned | 04.08.2016 10:30 | 04.08.2016 13:00 | Peterborough | E_PETEM1 | - | Fossil Gas | - | - | - | 240 | - | - | MW | Commissioning- Variable Output | - | - | - | |
23.07.2016 07:26 | Unplanned | 21.07.2016 10:56 | 23.07.2016 10:10 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 390 | 515 | MW | Boiler | - | - | - | |
22.07.2016 10:21 | Unplanned | 22.07.2016 10:18 | 22.07.2016 12:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 500 | 310 | MW | Outage Ends | - | - | - | |
22.07.2016 05:20 | Unplanned | 22.07.2016 05:10 | 22.07.2016 12:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 0 | 905 | MW | 2 - Turbine | - | - | - | |
22.07.2016 03:59 | Unplanned | 22.07.2016 03:47 | 22.07.2016 21:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 390 | 515 | MW | 6 - Outage Ends | - | - | - | |
21.07.2016 15:25 | Unplanned | 24.07.2016 23:00 | 27.07.2016 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | CANCELLED | Dismissed | 580 | - | - | MW | Commissioning- Variable Output | - | - | - | |
19.07.2016 09:36 | Planned | 04.07.2016 07:01 | 20.07.2016 08:00 | Langage | T_LAGA-1 | - | Fossil Gas | GT | - | - | 905 | 452 | 453 | MW | Planned | - | - | - | |
18.07.2016 16:47 | Planned | 18.07.2016 23:01 | 11.09.2016 22:59 | Barry | E_BRYP-1 | - | Fossil Gas | Plant | - | - | 245 | 0 | 245 | MW | Planned | - | - | - | |
16.07.2016 15:42 | Unplanned | 16.07.2016 04:10 | 16.07.2016 17:30 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 500 | 310 | MW | Turbine | - | - | - | |
15.07.2016 11:25 | Unplanned | 20.07.2016 12:00 | 21.07.2016 12:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | CANCELLED | Dismissed | 905 | - | - | MW | Commissioning- Variable Output | - | - | - | |
14.07.2016 16:36 | Unplanned | 14.07.2016 15:40 | 18.07.2016 08:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 0 | 905 | MW | Turbine | - | - | - | |
14.07.2016 15:49 | Unplanned | 14.07.2016 15:40 | 16.07.2016 09:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 0 | 905 | MW | Outage Ends | - | - | - | |
14.07.2016 10:50 | Unplanned | 13.07.2016 18:10 | 14.07.2016 16:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 489 | 321 | MW | - | - | - | - | |
11.07.2016 10:25 | Planned | 04.07.2016 07:01 | 14.07.2016 09:00 | Langage | T_LAGA-1 | - | Fossil Gas | GT | - | - | 905 | 452 | 453 | MW | Planned | - | - | - | |
11.07.2016 08:49 | Planned | 12.07.2016 06:00 | 15.07.2016 22:00 | Lincs 2 | T_LNCSW-2 | - | Wind Offshore | Plant | CANCELLED | Dismissed | 140 | 140 | 0 | MW | Planned | - | - | - | |
11.07.2016 08:48 | Planned | 12.07.2016 06:00 | 15.07.2016 22:00 | Lincs 1 | T_LNCSW-1 | - | Wind Offshore | Plant | CANCELLED | Dismissed | 130 | 130 | 0 | MW | Planned | - | - | - | |
07.07.2016 09:56 | Unplanned | 30.06.2016 23:00 | 18.07.2016 23:00 | Barry | E_BRYP-1 | - | Fossil Gas | Plant | - | - | 245 | 0 | 245 | MW | 2 - Turbine | - | - | - | |
03.07.2016 17:15 | Unplanned | 03.07.2016 17:05 | 04.07.2016 12:00 | South Humber Bank 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 520 | 290 | MW | 6 - Outage Ends | - | - | - | |
29.06.2016 12:45 | Unplanned | 29.06.2016 12:15 | 30.06.2016 23:00 | Barry | E_BRYP-1 | - | Fossil Gas | Plant | - | - | 245 | 0 | 245 | MW | 2 - Turbine | - | - | - | |
28.06.2016 17:07 | Unplanned | 28.06.2016 16:00 | 28.06.2016 19:00 | South Humber Bank 1 | T_SHBA-1 | - | Fossil Gas | GT | - | - | 810 | 540 | 270 | MW | 8 - Early End to Planned Outage | - | - | - | |
27.06.2016 10:41 | Planned | 28.06.2016 04:00 | 28.06.2016 19:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | GT | - | - | 810 | 540 | 270 | MW | Planned | - | - | - | |
23.06.2016 16:03 | Unplanned | 17.07.2016 23:00 | 20.07.2016 23:00 | South Humber Bank 2 | T_SHBA-2 | - | Fossil Gas | Plant | - | - | 580 | 540 | 40 | MW | 10 - Commissioning - Variable Output | - | - | - | |
23.06.2016 15:58 | Unplanned | 17.07.2016 23:00 | 07.08.2016 23:00 | South Humber Bank 1 | T_SHBA-1 | - | Fossil Gas | Plant | - | - | 810 | 0 | 810 | MW | Station Limit | - | - | - | |
23.06.2016 15:56 | Unplanned | 17.07.2016 23:00 | 07.08.2016 23:00 | South Humber Bank 2 | T_SHBA-2 | - | Fossil Gas | Plant | - | - | 580 | 540 | 40 | MW | Station Limit | - | - | - | |
17.06.2016 16:16 | Unplanned | 17.06.2016 16:00 | 17.06.2016 18:00 | South Humber Bank 1 | T_SHBA-1 | - | Fossil Gas | GT | - | - | 810 | 810 | 0 | MW | 6 - Outage Ends | - | - | - | |
13.06.2016 16:20 | Unplanned | 13.06.2016 06:19 | 13.06.2016 15:59 | South Humber Bank 1 | T_SHBA-1 | - | Fossil Gas | Plant | - | - | 810 | 540 | 270 | MW | 6 - Outage Ends | - | - | - | |
07.06.2016 13:34 | Planned | 04.04.2016 23:30 | 17.06.2016 23:30 | Barry | E_BRYP-1 | - | Fossil Gas | Plant | - | - | 245 | 0 | 245 | MW | Planned | - | - | - | |
28.05.2016 16:48 | Unplanned | 28.05.2016 16:47 | 29.05.2016 21:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 0 | 905 | MW | Early Start to Planned Outage | - | - | - | |
24.05.2016 16:09 | Unplanned | 24.05.2016 15:55 | 24.05.2016 18:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 540 | 270 | MW | Outage Ends | - | - | - | |
24.05.2016 09:27 | Planned | 30.08.2016 00:01 | 31.08.2016 23:59 | Peterborough | E_PETEM1 | - | Fossil Gas | GT | CANCELLED | Dismissed | 240 | 120 | 120 | MW | Planned | - | - | - | |
20.05.2016 15:14 | Planned | 01.06.2016 00:01 | 02.06.2016 23:59 | Peterborough | E_PETEM1 | - | Fossil Gas | GT | CANCELLED | Dismissed | 240 | 120 | 120 | MW | Planned | - | - | - | |
10.05.2016 17:28 | Unplanned | 09.05.2016 17:33 | 10.05.2016 17:30 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 905 | 0 | MW | Outage Ends | - | - | - | |
10.05.2016 02:59 | Unplanned | 10.05.2016 02:58 | 10.05.2016 04:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 511 | 299 | MW | Outage Ends | - | - | - | |
09.05.2016 17:26 | Unplanned | 09.05.2016 17:00 | 09.05.2016 20:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 900 | 5 | MW | Outage Ends | - | - | - | |
08.05.2016 13:14 | Unplanned | 08.05.2016 13:13 | 08.05.2016 15:34 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 240 | 570 | MW | Outage Ends | - | - | - | |
07.05.2016 14:37 | Unplanned | 07.05.2016 14:33 | 07.05.2016 14:54 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 0 | 905 | MW | Outage Ends | - | - | - | |
05.05.2016 09:50 | Unplanned | 05.05.2016 09:49 | 05.05.2016 11:10 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 840 | 65 | MW | Outage Ends | - | - | - | |
04.05.2016 13:02 | Unplanned | 04.05.2016 08:30 | 04.05.2016 16:30 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 0 | 905 | MW | Turbine | - | - | - | |
04.05.2016 09:58 | Unplanned | 04.05.2016 09:55 | 04.05.2016 13:07 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 540 | 270 | MW | Outage Ends | - | - | - | |
01.05.2016 14:35 | Unplanned | 01.05.2016 16:00 | 02.05.2016 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 520 | 290 | MW | Outage Ends | - | - | - | |
01.05.2016 14:34 | Unplanned | 01.05.2016 16:00 | 02.05.2016 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 520 | 290 | MW | Early End to Planned Outage | - | - | - | |
30.04.2016 18:26 | Unplanned | 30.04.2016 18:24 | 30.04.2016 19:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 0 | 905 | MW | Boiler | - | - | - | |
25.04.2016 14:25 | Planned | 29.05.2016 21:00 | 04.07.2016 07:00 | Langage | T_LAGA-1 | - | Fossil Gas | Plant | - | - | 905 | 0 | 905 | MW | Planned | - | - | - | |
21.04.2016 12:02 | Planned | 29.04.2016 23:00 | 02.05.2016 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | Plant | - | - | 810 | 0 | 810 | MW | Planned | - | - | - | |
16.04.2016 18:29 | Unplanned | 16.04.2016 18:25 | 16.04.2016 20:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 905 | 0 | MW | Outage Ends | - | - | - | |
15.04.2016 14:09 | Unplanned | 15.04.2016 14:10 | 15.04.2016 15:10 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 80 | 825 | MW | 2 - Turbine | - | - | - | |
14.04.2016 12:59 | Unplanned | 10.03.2016 19:40 | 15.04.2016 09:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 0 | 905 | MW | Turbine | - | - | - | |
13.04.2016 09:01 | Unplanned | 13.04.2016 06:51 | 13.04.2016 10:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 0 | 810 | MW | Boiler | - | - | - | |
26.03.2016 11:45 | Unplanned | 26.03.2016 11:43 | 27.03.2016 22:00 | Peterborough | E_PETEM1 | - | Fossil Gas | - | - | - | 240 | 230 | 10 | MW | Early End to Planned Outage | - | - | - | |
26.03.2016 10:57 | Unplanned | 26.03.2016 10:55 | 26.03.2016 13:00 | Peterborough | E_PETEM1 | - | Fossil Gas | - | - | - | 240 | 0 | 240 | MW | Outage Ends | - | - | - | |
25.03.2016 13:38 | Unplanned | 25.03.2016 14:15 | 25.03.2016 15:15 | Peterborough | E_PETEM1 | - | Fossil Gas | - | - | - | 240 | 0 | 240 | MW | Outage Ends | - | - | - | |
25.03.2016 09:20 | Unplanned | 25.03.2016 09:30 | 25.03.2016 13:45 | Peterborough | E_PETEM1 | - | Fossil Gas | - | CANCELLED | Dismissed | 240 | 120 | 120 | MW | Testing - Variable Output | - | - | - | |
24.03.2016 14:30 | Unplanned | 24.03.2016 17:30 | 24.03.2016 21:45 | Peterborough | E_PETEM1 | - | Fossil Gas | - | CANCELLED | Dismissed | 240 | 120 | 120 | MW | Testing - Variable Output | - | - | - | |
24.03.2016 14:28 | Planned | 05.03.2016 06:00 | 27.03.2016 22:00 | Peterborough | E_PETEM1 | - | Fossil Gas | Plant | - | - | 240 | 0 | 240 | MW | Planned | - | - | - | |
24.03.2016 12:07 | Unplanned | 24.03.2016 15:30 | 24.03.2016 19:45 | Peterborough | E_PETEM1 | - | Fossil Gas | - | CANCELLED | Dismissed | 240 | 120 | 120 | MW | Testing - Variable Output | - | - | - | |
13.03.2016 12:09 | Unplanned | 13.03.2016 23:30 | 14.03.2016 12:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 520 | 290 | MW | Boiler | - | - | - | |
11.03.2016 14:32 | Planned | 01.06.2016 01:00 | 30.06.2016 23:59 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | Plant | CANCELLED | Dismissed | 810 | 0 | 810 | MW | Planned | - | - | - | |
09.03.2016 20:46 | Unplanned | 09.03.2016 20:40 | 09.03.2016 23:59 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 540 | 270 | MW | Outage Ends | - | - | - | |
09.03.2016 07:30 | Unplanned | 09.03.2016 07:23 | 09.03.2016 10:28 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 900 | 5 | MW | Outage Ends | - | - | - | |
08.03.2016 13:36 | Unplanned | 08.03.2016 13:45 | 08.03.2016 21:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 900 | 5 | MW | Early End to Planned Outage | - | - | - | |
07.03.2016 16:10 | Unplanned | 07.03.2016 16:08 | 07.03.2016 17:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 540 | 270 | MW | Outage Ends | - | - | - | |
04.03.2016 14:03 | Unplanned | 04.03.2016 14:03 | 04.03.2016 15:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 905 | 0 | MW | Outage Ends | - | - | - | |
04.03.2016 07:49 | Unplanned | 04.03.2016 07:48 | 04.03.2016 22:59 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 540 | 270 | MW | Outage Ends | - | - | - | |
02.03.2016 08:29 | Unplanned | 02.03.2016 09:00 | 02.03.2016 13:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 0 | 905 | MW | 1 - Boiler | - | - | - | |
01.03.2016 13:16 | Unplanned | 01.03.2016 13:18 | 01.03.2016 14:30 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 200 | 610 | MW | Turbine | - | - | - | |
27.02.2016 15:09 | Unplanned | 27.02.2016 15:08 | 27.02.2016 16:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 540 | 40 | MW | 6 - Outage Ends | - | - | - | |
27.02.2016 10:45 | Unplanned | 27.02.2016 10:45 | 27.02.2016 11:30 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 80 | 825 | MW | 2 - Turbine | - | - | - | |
25.02.2016 14:47 | Planned | 05.03.2016 21:00 | 08.03.2016 21:00 | Langage | T_LAGA-1 | - | Fossil Gas | GT | - | - | 905 | 452 | 453 | MW | Planned | - | - | - | |
23.02.2016 12:34 | Planned | 24.02.2016 21:00 | 27.02.2016 21:00 | Langage | T_LAGA-1 | - | Fossil Gas | GT | CANCELLED | Dismissed | 905 | 452 | 453 | MW | Planned | - | - | - | |
22.02.2016 16:19 | Unplanned | 22.02.2016 16:18 | 22.02.2016 19:30 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 843 | 62 | MW | 6 - Outage Ends | - | - | - | |
17.02.2016 02:48 | Unplanned | 17.02.2016 02:46 | 17.02.2016 03:55 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 537 | 43 | MW | 6 - Outage Ends | - | - | - | |
16.02.2016 14:46 | Unplanned | 16.02.2016 15:00 | 16.02.2016 16:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 540 | 40 | MW | Testing - Variable Output | - | - | - | |
12.02.2016 15:59 | Unplanned | 12.02.2016 14:54 | 12.02.2016 16:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 826 | 79 | MW | 6 - Outage Ends | - | - | - | |
06.02.2016 18:21 | Unplanned | 06.02.2016 18:21 | 06.02.2016 20:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 520 | 60 | MW | 6 - Outage Ends | - | - | - | |
02.02.2016 09:47 | Planned | 01.05.2016 00:00 | 16.05.2016 23:59 | Peterborough | E_PETEM1 | - | Fossil Gas | GT | CANCELLED | Dismissed | 240 | 120 | 120 | MW | Planned | - | - | - | |
02.02.2016 09:45 | Planned | 02.04.2016 00:00 | 29.04.2016 23:59 | Peterborough | E_PETEM1 | - | Fossil Gas | GT | CANCELLED | Dismissed | 240 | 120 | 120 | MW | Planned | - | - | - | |
29.01.2016 14:46 | Unplanned | 29.01.2016 20:00 | 29.01.2016 23:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 400 | 505 | MW | 2 - Turbine | - | - | - | |
24.01.2016 17:30 | Unplanned | 24.01.2016 17:30 | 24.01.2016 20:40 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 905 | 0 | MW | Outage Ends | - | - | - | |
16.01.2016 07:35 | Unplanned | 16.01.2016 07:32 | 16.01.2016 09:28 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 905 | 0 | MW | 6 - Outage Ends | - | - | - | |
13.01.2016 12:53 | Planned | 21.01.2016 06:30 | 21.01.2016 15:00 | Peterborough | E_PETEM1 | - | Fossil Gas | Plant | - | - | 240 | 0 | 240 | MW | Planned | - | - | - | |
08.01.2016 21:20 | Unplanned | 08.01.2016 21:15 | 08.01.2016 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 520 | 60 | MW | Outage Ends | - | - | - | |
08.01.2016 14:15 | Unplanned | 08.01.2016 14:13 | 08.01.2016 15:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 800 | 105 | MW | 6 - Outage Ends | - | - | - | |
08.01.2016 11:29 | Unplanned | 08.01.2016 11:27 | 08.01.2016 11:57 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 20 | 885 | MW | 2 - Turbine | - | - | - | |
06.01.2016 14:38 | Planned | 07.01.2016 22:00 | 08.01.2016 10:00 | Langage | T_LAGA-1 | - | Fossil Gas | Plant | - | - | 905 | 0 | 905 | MW | Planned | - | - | - | |
06.01.2016 10:34 | Unplanned | 30.09.2016 23:00 | 31.03.2017 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | Active | 580 | 540 | 40 | MW | Station Limit | Production Unavailability | British Gas Trading Ltd | 21X000000001111W | |
06.01.2016 10:31 | Unplanned | 29.02.2016 23:00 | 30.09.2016 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 0 | 580 | MW | Station Limit | - | - | - | |
06.01.2016 10:25 | Unplanned | 29.02.2016 23:00 | 30.09.2016 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 540 | 270 | MW | Station Limit | - | - | - | |
06.01.2016 10:19 | Unplanned | 23.10.2015 23:00 | 29.02.2016 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 0 | 810 | MW | Station Limit | - | - | - | |
06.01.2016 10:13 | Unplanned | 23.09.2015 23:00 | 31.03.2017 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | CANCELLED | Dismissed | 810 | 0 | 810 | MW | Station Limit | Production Unavailability | British Gas Trading Ltd | 21X000000001111W | |
06.01.2016 10:11 | Unplanned | 22.09.2015 23:59 | 31.03.2017 23:59 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | CANCELLED | Dismissed | 810 | 0 | 810 | MW | Station Limit | Production Unavailability | British Gas Trading Ltd | 21X000000001111W | |
06.01.2016 10:10 | Unplanned | 05.08.2015 03:00 | 31.03.2017 23:59 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | CANCELLED | Dismissed | 810 | 0 | 810 | MW | Station Limit | Production Unavailability | British Gas Trading Ltd | 21X000000001111W | |
31.12.2015 09:27 | Unplanned | 31.12.2015 09:21 | 31.12.2015 10:40 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 905 | 0 | MW | 6 - Outage Ends | - | - | - | |
29.12.2015 11:33 | Unplanned | 26.11.2015 22:15 | 26.11.2015 23:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | CANCELLED | Dismissed | 905 | 905 | 0 | MW | Early End to Planned Outage | - | - | - | |
28.12.2015 12:33 | Unplanned | 28.12.2015 12:34 | 28.12.2015 13:30 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 813 | 92 | MW | 6 - Outage Ends | - | - | - | |
25.12.2015 18:14 | Unplanned | 25.12.2015 18:15 | 25.12.2015 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 905 | 0 | MW | Outage Ends | - | - | - | |
17.12.2015 16:21 | Planned | 19.02.2016 23:00 | 28.02.2016 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | GT | - | - | 810 | 540 | 270 | MW | Planned | - | - | - | |
17.12.2015 16:20 | Planned | 11.03.2016 23:00 | 20.03.2016 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | GT | - | - | 580 | 290 | 290 | MW | Planned | - | - | - | |
17.12.2015 16:17 | Planned | 19.03.2016 23:00 | 28.03.2016 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | GT | - | - | 580 | 290 | 290 | MW | Planned | - | - | - | |
17.12.2015 16:05 | Planned | 03.09.2016 01:00 | 27.09.2016 23:59 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | Plant | CANCELLED | Dismissed | 580 | 0 | 580 | MW | Planned | - | - | - | |
17.12.2015 15:07 | Planned | 31.01.2016 23:00 | 09.02.2016 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | GT | - | - | 810 | 540 | 270 | MW | Planned | - | - | - | |
17.12.2015 14:57 | Planned | 22.01.2016 23:00 | 31.01.2016 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | GT | - | - | 810 | 540 | 270 | MW | Planned | - | - | - | |
15.12.2015 17:11 | Unplanned | 15.12.2015 17:05 | 15.12.2015 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 905 | 0 | MW | Outage Ends | - | - | - | |
14.12.2015 14:02 | Unplanned | 14.12.2015 14:00 | 14.12.2015 18:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 905 | 0 | MW | Outage Ends | - | - | - | |
12.12.2015 10:30 | Unplanned | 12.12.2015 12:00 | 12.12.2015 16:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 0 | 580 | MW | 2 - Turbine | - | - | - | |
11.12.2015 09:52 | Planned | 13.12.2015 00:00 | 13.12.2015 23:59 | Peterborough | E_PETEM1 | - | Fossil Gas | Plant | - | - | 240 | 0 | 240 | MW | Planned | - | - | - | |
10.12.2015 13:30 | Planned | 16.12.2015 22:00 | 17.12.2015 13:00 | Langage | T_LAGA-1 | - | Fossil Gas | Plant | - | - | 905 | 0 | 905 | MW | Planned | - | - | - | |
09.12.2015 17:07 | Planned | 11.12.2015 00:01 | 12.12.2015 23:59 | Peterborough | E_PETEM1 | - | Fossil Gas | Plant | - | - | 240 | 0 | 240 | MW | Planned | - | - | - | |
08.12.2015 15:25 | Planned | 10.12.2015 00:01 | 10.12.2015 23:59 | Peterborough | E_PETEM1 | - | Fossil Gas | Plant | - | - | 240 | 0 | 240 | MW | Planned | - | - | - | |
03.12.2015 14:38 | Planned | 07.12.2015 06:00 | 09.12.2015 23:59 | Peterborough | E_PETEM1 | - | Fossil Gas | Plant | - | - | 240 | 0 | 240 | MW | Planned | - | - | - | |
03.12.2015 11:21 | Unplanned | 03.12.2015 12:00 | 03.12.2015 15:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 267 | 313 | MW | 2 - Turbine | - | - | - | |
02.12.2015 08:43 | Planned | 15.01.2016 21:00 | 18.01.2016 06:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | GT | CANCELLED | Dismissed | 580 | 290 | 290 | MW | Planned | - | - | - | |
02.12.2015 08:43 | Planned | 22.01.2016 21:00 | 25.01.2016 06:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | GT | CANCELLED | Dismissed | 580 | 290 | 290 | MW | Planned | - | - | - | |
30.11.2015 09:45 | Unplanned | 30.11.2015 12:00 | 30.11.2015 17:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 262 | 318 | MW | 2 - Turbine | - | - | - | |
27.11.2015 16:37 | Unplanned | 26.11.2015 22:15 | 26.11.2015 23:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 905 | 0 | MW | Early End to Planned Outage | - | - | - | |
25.11.2015 11:31 | Planned | 26.11.2015 07:00 | 26.11.2015 15:30 | Peterborough | E_PETEM1 | - | Fossil Gas | Plant | - | - | 240 | 0 | 240 | MW | Planned | - | - | - | |
25.11.2015 10:38 | Unplanned | 25.11.2015 13:30 | 25.11.2015 15:30 | Peterborough | E_PETEM1 | - | Fossil Gas | - | - | - | 240 | 0 | 240 | MW | Inspection/Overhaul | - | - | - | |
24.11.2015 14:14 | Planned | 25.11.2015 07:00 | 25.11.2015 13:30 | Peterborough | E_PETEM1 | - | Fossil Gas | Plant | - | - | 240 | 0 | 240 | MW | Planned | - | - | - | |
21.11.2015 13:43 | Unplanned | 21.11.2015 11:57 | 21.11.2015 15:57 | Barry | E_BRYP-1 | - | Fossil Gas | - | - | - | 245 | 0 | 245 | MW | - | - | - | - | |
19.11.2015 09:58 | Planned | 25.11.2015 23:00 | 26.11.2015 23:00 | Langage | T_LAGA-1 | - | Fossil Gas | Plant | - | - | 905 | 0 | 905 | MW | Planned | - | - | - | |
17.11.2015 12:19 | Planned | 07.11.2015 00:01 | 30.11.2015 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | Plant | - | - | 810 | 0 | 810 | MW | Planned | - | - | - | |
16.11.2015 02:18 | Unplanned | 16.11.2015 01:47 | 16.11.2015 04:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 797 | 108 | MW | Outage Ends | - | - | - | |
16.11.2015 02:06 | Unplanned | 16.11.2015 01:57 | 16.11.2015 04:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | CANCELLED | Dismissed | 905 | 797 | 108 | MW | 6 - Outage Ends | - | - | - | |
15.11.2015 18:47 | Unplanned | 15.11.2015 18:48 | 15.11.2015 22:46 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 500 | 405 | MW | 2 - Turbine | - | - | - | |
14.11.2015 11:15 | Unplanned | 14.11.2015 09:30 | 14.11.2015 14:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 540 | 40 | MW | Early End to Planned Outage | - | - | - | |
12.11.2015 19:50 | Unplanned | 12.11.2015 19:50 | 12.11.2015 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 820 | 85 | MW | 6 - Outage Ends | - | - | - | |
12.11.2015 08:54 | Planned | 14.11.2015 06:00 | 14.11.2015 14:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | GT | - | - | 580 | 290 | 290 | MW | Planned | - | - | - | |
11.11.2015 12:59 | Planned | 12.11.2015 00:00 | 12.11.2015 16:00 | Langage | T_LAGA-1 | - | Fossil Gas | GT | CANCELLED | Dismissed | 905 | 452 | 453 | MW | Planned | - | - | - | |
08.11.2015 09:13 | Unplanned | 08.11.2015 09:04 | 08.11.2015 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 815 | 90 | MW | 6 - Outage Ends | - | - | - | |
30.10.2015 12:20 | Unplanned | 30.10.2015 12:15 | 07.11.2015 00:01 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 0 | 810 | MW | Turbine | - | - | - | |
28.10.2015 02:19 | Unplanned | 28.10.2015 06:00 | 28.10.2015 09:30 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 518 | 62 | MW | 6 - Outage Ends | - | - | - | |
26.10.2015 22:25 | Unplanned | 26.10.2015 22:23 | 27.10.2015 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 766 | 139 | MW | 6 - Outage Ends | - | - | - | |
25.10.2015 12:30 | Unplanned | 25.10.2015 15:00 | 25.10.2015 18:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 527 | 53 | MW | 6 - Outage Ends | - | - | - | |
22.10.2015 16:20 | Unplanned | 23.10.2015 07:00 | 23.10.2015 16:00 | Barry | E_BRYP-1 | - | Fossil Gas | - | - | - | 245 | 227 | 18 | MW | Testing - Variable Output | - | - | - | |
20.10.2015 10:02 | Unplanned | 21.10.2015 23:00 | 23.10.2015 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 0 | 580 | MW | Station Limit | - | - | - | |
20.10.2015 09:58 | Unplanned | 21.10.2015 23:00 | 23.10.2015 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 540 | 270 | MW | Station Limit | - | - | - | |
20.10.2015 08:53 | Unplanned | 21.10.2015 07:00 | 21.10.2015 16:00 | Killingholme | T_KILNS-1 | - | Fossil Gas | - | - | - | 665 | 660 | 5 | MW | Testing - Variable Output | - | - | - | |
18.10.2015 16:34 | Unplanned | 18.10.2015 16:35 | 18.10.2015 18:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 400 | 505 | MW | 2 - Turbine | - | - | - | |
14.10.2015 00:03 | Unplanned | 14.10.2015 00:00 | 14.10.2015 01:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 534 | 46 | MW | 6 - Outage Ends | - | - | - | |
13.10.2015 15:03 | Unplanned | 13.10.2015 15:01 | 13.10.2015 23:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 0 | 905 | MW | 7 - Early Start to Planned Outage | - | - | - | |
13.10.2015 14:29 | Unplanned | 14.10.2015 07:00 | 14.10.2015 23:00 | Killingholme | T_KILNS-1 | - | Fossil Gas | - | - | - | 665 | 665 | 0 | MW | Testing - Variable Output | - | - | - | |
07.10.2015 09:52 | Planned | 06.04.2018 06:00 | 21.04.2018 23:30 | Barry | E_BRYP-1 | - | Fossil Gas | Plant | CANCELLED | Dismissed | 245 | 0 | 245 | MW | Planned | Production Unavailability | British Gas Trading Ltd | 21X000000001111W | |
03.10.2015 00:52 | Unplanned | 03.10.2015 00:53 | 03.10.2015 07:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 499 | 81 | MW | 6 - Outage Ends | - | - | - | |
01.10.2015 23:51 | Unplanned | 02.10.2015 16:30 | 05.10.2015 10:00 | Lincs 2 | T_LNCSW-2 | - | Wind Offshore | - | - | - | 140 | 140 | 0 | MW | Early End to Outage | - | - | - | |
01.10.2015 23:41 | Unplanned | 02.10.2015 16:30 | 05.10.2015 10:00 | Lincs 1 | T_LNCSW-1 | - | Wind Offshore | - | - | - | 130 | 129 | 1 | MW | Early End to Outage | - | - | - | |
26.09.2015 22:07 | Unplanned | 26.09.2015 22:10 | 26.09.2015 23:00 | Barry | E_BRYP-1 | - | Fossil Gas | - | - | - | 245 | 245 | 0 | MW | Outage Ends | - | - | - | |
24.09.2015 15:08 | Unplanned | 24.09.2015 15:05 | 24.09.2015 17:10 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 822 | 83 | MW | Outage Ends | - | - | - | |
24.09.2015 12:43 | Planned | 23.06.2017 00:01 | 26.06.2017 23:59 | Killingholme | T_KILNS-1 | - | Fossil Gas | GT | CANCELLED | Dismissed | 665 | 443 | 222 | MW | Planned | Production Unavailability | British Gas Trading Ltd | 21X000000001111W | |
24.09.2015 12:43 | Planned | 09.12.2016 00:01 | 12.12.2016 23:59 | Killingholme | T_KILNS-1 | - | Fossil Gas | GT | CANCELLED | Dismissed | 665 | 443 | 222 | MW | Planned | Production Unavailability | British Gas Trading Ltd | 21X000000001111W | |
24.09.2015 12:43 | Planned | 26.08.2016 00:01 | 29.08.2016 23:59 | Killingholme | T_KILNS-1 | - | Fossil Gas | GT | CANCELLED | Dismissed | 665 | 443 | 222 | MW | Planned | - | - | - | |
24.09.2015 12:42 | Planned | 19.02.2016 00:01 | 22.02.2016 23:59 | Killingholme | T_KILNS-1 | - | Fossil Gas | GT | CANCELLED | Dismissed | 665 | 443 | 222 | MW | Planned | - | - | - | |
24.09.2015 12:42 | Planned | 04.12.2015 00:01 | 07.12.2015 23:59 | Killingholme | T_KILNS-1 | - | Fossil Gas | GT | CANCELLED | Dismissed | 665 | 443 | 222 | MW | Planned | - | - | - | |
24.09.2015 11:19 | Unplanned | 24.09.2015 11:13 | 24.09.2015 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 805 | 100 | MW | Outage Ends | - | - | - | |
24.09.2015 07:56 | Unplanned | 24.09.2015 08:00 | 24.09.2015 09:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 95 | 485 | MW | 2 - Turbine | - | - | - | |
23.09.2015 17:12 | Unplanned | 23.09.2015 23:00 | 24.09.2015 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 540 | 40 | MW | Early End to Planned Outage | - | - | - | |
23.09.2015 15:24 | Unplanned | 23.09.2015 15:27 | 23.09.2015 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 240 | 570 | MW | Boiler | - | - | - | |
23.09.2015 15:21 | Unplanned | 23.09.2015 23:00 | 24.09.2015 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | CANCELLED | Dismissed | 580 | 0 | 580 | MW | Early End to Planned Outage | - | - | - | |
23.09.2015 15:21 | Unplanned | 23.09.2015 23:00 | 24.09.2015 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | CANCELLED | Dismissed | 580 | 540 | 40 | MW | Early End to Planned Outage | - | - | - | |
23.09.2015 10:51 | Planned | 01.09.2015 00:01 | 25.09.2015 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | GT | - | - | 810 | 540 | 270 | MW | Planned | - | - | - | |
22.09.2015 11:03 | Unplanned | 22.09.2015 23:59 | 24.09.2015 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 540 | 270 | MW | Station Limit | - | - | - | |
22.09.2015 10:57 | Planned | 05.09.2015 01:00 | 24.09.2015 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | Plant | - | - | 580 | 0 | 580 | MW | Planned | - | - | - | |
21.09.2015 17:36 | Planned | 23.09.2015 00:01 | 06.10.2015 23:59 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | ST28 | CANCELLED | Dismissed | 580 | 290 | 290 | MW | Planned | - | - | - | |
21.09.2015 11:28 | Unplanned | 21.09.2015 10:34 | 25.09.2015 07:38 | Lincs 2 | T_LNCSW-2 | - | Wind Offshore | - | - | - | 140 | 140 | 0 | MW | Outage Ends | - | - | - | |
21.09.2015 11:23 | Unplanned | 21.09.2015 10:32 | 25.09.2015 07:37 | Lincs 1 | T_LNCSW-1 | - | Wind Offshore | - | - | - | 130 | 129 | 1 | MW | Outage Ends | - | - | - | |
21.09.2015 10:34 | Planned | 21.09.2015 07:00 | 05.10.2015 10:00 | Lincs 2 | T_LNCSW-2 | - | Wind Offshore | Plant | - | - | 140 | 0 | 140 | MW | Planned | - | - | - | |
21.09.2015 10:32 | Planned | 21.09.2015 07:00 | 05.10.2015 10:00 | Lincs 1 | T_LNCSW-1 | - | Wind Offshore | Plant | - | - | 130 | 0 | 130 | MW | Planned | - | - | - | |
19.09.2015 13:21 | Unplanned | 19.09.2015 13:22 | 20.09.2015 00:00 | Lincs 2 | T_LNCSW-2 | - | Wind Offshore | - | - | - | 140 | 134 | 6 | MW | Outage Ends | - | - | - | |
19.09.2015 13:21 | Unplanned | 19.09.2015 13:21 | 20.09.2015 00:00 | Lincs 1 | T_LNCSW-1 | - | Wind Offshore | - | - | - | 130 | 122 | 8 | MW | Outage Ends | - | - | - | |
18.09.2015 13:58 | Planned | 25.09.2015 05:30 | 25.09.2015 23:00 | Barry | E_BRYP-1 | - | Fossil Gas | Plant | - | - | 245 | 0 | 245 | MW | Planned | - | - | - | |
15.09.2015 12:01 | Planned | 13.10.2015 23:00 | 17.10.2015 23:00 | Langage | T_LAGA-1 | - | Fossil Gas | Plant | - | - | 905 | 0 | 905 | MW | Planned | - | - | - | |
07.09.2015 17:27 | Unplanned | 07.09.2015 17:19 | 07.09.2015 19:15 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 501 | 309 | MW | 6 - Outage Ends | - | - | - | |
07.09.2015 14:35 | Planned | 13.09.2015 23:00 | 18.09.2015 23:00 | Langage | T_LAGA-1 | - | Fossil Gas | GT | CANCELLED | Dismissed | 905 | 452 | 453 | MW | Planned | - | - | - | |
07.09.2015 12:08 | Unplanned | 07.09.2015 12:04 | 07.09.2015 23:59 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 501 | 309 | MW | 6 - Outage Ends | - | - | - | |
02.09.2015 10:20 | Unplanned | 03.09.2015 11:00 | 03.09.2015 16:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 260 | 320 | MW | Testing - Variable Output | - | - | - | |
02.09.2015 09:16 | Unplanned | 31.08.2015 23:59 | 06.09.2015 23:59 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | CANCELLED | Dismissed | 810 | 540 | 270 | MW | Inspection/Overhaul | - | - | - | |
31.08.2015 22:21 | Unplanned | 31.08.2015 22:30 | 05.09.2015 01:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 0 | 810 | MW | Station Limit | - | - | - | |
31.08.2015 22:19 | Unplanned | 31.08.2015 22:30 | 05.09.2015 01:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 540 | 40 | MW | Station Limit | - | - | - | |
31.08.2015 17:05 | Unplanned | 31.08.2015 16:54 | 31.08.2015 17:30 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 397 | 508 | MW | 6 - Outage Ends | - | - | - | |
29.08.2015 20:32 | Unplanned | 29.08.2015 20:33 | 01.09.2015 05:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 540 | 40 | MW | 6 - Outage Ends | - | - | - | |
27.08.2015 17:01 | Unplanned | 27.08.2015 16:49 | 27.08.2015 23:59 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 540 | 270 | MW | 6 - Outage Ends | - | - | - | |
27.08.2015 11:26 | Planned | 24.08.2015 23:40 | 31.08.2015 23:59 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | GT | - | - | 810 | 540 | 270 | MW | Planned | - | - | - | |
26.08.2015 15:38 | Unplanned | 25.08.2015 23:59 | 29.08.2015 00:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | CANCELLED | Dismissed | 810 | 540 | 270 | MW | Inspection/Overhaul | - | - | - | |
25.08.2015 18:20 | Unplanned | 25.08.2015 19:11 | 26.08.2015 23:59 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 243 | 567 | MW | 2 - Turbine | - | - | - | |
25.08.2015 14:11 | Unplanned | 25.08.2015 14:11 | 25.08.2015 19:11 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 249 | 561 | MW | 2 - Turbine | - | - | - | |
25.08.2015 06:20 | Unplanned | 25.08.2015 06:16 | 31.08.2015 23:59 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 540 | 270 | MW | Outage Ends | - | - | - | |
24.08.2015 08:16 | Unplanned | 24.08.2015 08:30 | 24.08.2015 11:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 85 | 725 | MW | 2 - Turbine | - | - | - | |
20.08.2015 09:52 | Unplanned | 20.08.2015 11:00 | 20.08.2015 16:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | CANCELLED | Dismissed | 580 | 430 | 150 | MW | Testing - Variable Output | - | - | - | |
18.08.2015 16:24 | Unplanned | 18.08.2015 16:21 | 18.08.2015 21:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 901 | 4 | MW | Outage Ends | - | - | - | |
18.08.2015 12:27 | Unplanned | 18.08.2015 13:30 | 18.08.2015 14:30 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 0 | 905 | MW | 1 - Boiler | - | - | - | |
11.08.2015 09:23 | Planned | 11.06.2016 01:00 | 16.06.2016 23:59 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | GT | CANCELLED | Dismissed | 580 | 290 | 290 | MW | Planned | - | - | - | |
11.08.2015 09:23 | Planned | 12.09.2015 00:00 | 18.09.2015 00:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | GT | CANCELLED | Dismissed | 810 | 540 | 270 | MW | Planned | - | - | - | |
11.08.2015 09:21 | Planned | 09.04.2016 00:01 | 15.04.2016 23:59 | Barry | E_BRYP-1 | - | Fossil Gas | Plant | CANCELLED | Dismissed | 245 | 0 | 245 | MW | Planned | - | - | - | |
06.08.2015 11:54 | Unplanned | 06.08.2015 11:53 | 06.08.2015 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 792 | 113 | MW | 6 - Outage Ends | - | - | - | |
05.08.2015 16:18 | Unplanned | 05.08.2015 16:19 | 05.08.2015 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 803 | 102 | MW | 8 - Early End to Planned Outage | - | - | - | |
03.08.2015 16:16 | Unplanned | 03.08.2015 16:00 | 05.08.2015 23:59 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 540 | 40 | MW | Outage Ends | - | - | - | |
03.08.2015 13:28 | Planned | 05.08.2015 00:00 | 05.08.2015 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | GT | - | - | 905 | 452 | 453 | MW | Planned | - | - | - | |
31.07.2015 13:00 | Planned | 28.07.2015 00:01 | 05.08.2015 23:59 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | Plant | - | - | 580 | 0 | 580 | MW | Planned | - | - | - | |
29.07.2015 13:42 | Planned | 21.07.2015 15:31 | 31.08.2015 23:59 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | GT | - | - | 810 | 540 | 270 | MW | Planned | - | - | - | |
28.07.2015 17:05 | Unplanned | 28.07.2015 17:03 | 28.07.2015 23:59 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 490 | 320 | MW | 6 - Outage Ends | - | - | - | |
28.07.2015 09:32 | Unplanned | 28.07.2015 10:00 | 28.07.2015 13:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 380 | 525 | MW | 1 - Boiler | - | - | - | |
27.07.2015 15:03 | Unplanned | 27.07.2015 13:30 | 27.07.2015 16:30 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 390 | 515 | MW | 1 - Boiler | - | - | - | |
24.07.2015 13:10 | Unplanned | 24.07.2015 11:00 | 31.07.2015 23:59 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 540 | 270 | MW | Outage Ends | - | - | - | |
23.07.2015 12:35 | Unplanned | 23.07.2015 21:30 | 23.07.2015 22:30 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 400 | 505 | MW | 2 - Turbine | - | - | - | |
23.07.2015 11:40 | Unplanned | 23.07.2015 13:30 | 23.07.2015 15:30 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | - | - | MW | Commissioning- Variable Output | - | - | - | |
22.07.2015 18:40 | Unplanned | 22.07.2015 20:00 | 22.07.2015 22:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 260 | 320 | MW | Testing - Variable Output | - | - | - | |
22.07.2015 10:25 | Planned | 21.07.2015 15:31 | 31.07.2015 23:59 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | GT | - | - | 810 | 540 | 270 | MW | Planned | - | - | - | |
21.07.2015 18:48 | Unplanned | 21.07.2015 20:00 | 21.07.2015 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | Dismissed | 905 | 890 | 15 | MW | 6 - Outage Ends | - | - | - | |
20.07.2015 20:38 | Unplanned | 20.07.2015 20:38 | 21.07.2015 08:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 511 | 69 | MW | 6 - Outage Ends | - | - | - | |
20.07.2015 12:34 | Unplanned | 20.07.2015 11:56 | 20.07.2015 16:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 430 | 150 | MW | Testing - Variable Output | - | - | - | |
17.07.2015 09:08 | Unplanned | 17.07.2015 09:07 | 19.07.2015 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 905 | 0 | MW | Outage Ends | - | - | - | |
17.07.2015 08:53 | Unplanned | 17.07.2015 08:48 | 19.07.2015 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | - | CANCELLED | Dismissed | 905 | - | - | MW | Commissioning- Variable Output | - | - | - | |
14.07.2015 15:08 | Unplanned | 14.07.2015 15:05 | 14.07.2015 16:00 | Barry | E_BRYP-1 | - | Fossil Gas | - | - | - | 245 | 160 | 85 | MW | Outage Ends | - | - | - | |
04.07.2015 11:38 | Unplanned | 12.07.2015 23:59 | 14.07.2015 07:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 416 | 489 | MW | Outage Ends | - | - | - | |
04.07.2015 10:38 | Planned | 02.06.2015 23:01 | 12.07.2015 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | GT | - | - | 905 | 452 | 453 | MW | Planned | - | - | - | |
19.06.2015 09:03 | Unplanned | 19.06.2015 09:02 | 19.06.2015 12:30 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 535 | 45 | MW | 6 - Outage Ends | - | - | - | |
18.06.2015 15:55 | Unplanned | 18.06.2015 14:56 | 18.06.2015 23:00 | Humber Bank 2 | T_SHBA-2 | - | Fossil Gas | Plant | - | - | 580 | 540 | 40 | MW | 8 - Early End to Planned Outage | - | - | - | |
16.06.2015 09:22 | Planned | 18.06.2015 13:00 | 18.06.2015 18:00 | Barry | E_BRYP-1 | - | Fossil Gas | Plant | - | - | 245 | 0 | 245 | MW | Planned | - | - | - | |
12.06.2015 13:34 | Unplanned | 15.06.2015 23:00 | 18.06.2015 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 0 | 580 | MW | Station Limit | - | - | - | |
12.06.2015 13:31 | Unplanned | 15.06.2015 23:00 | 18.06.2015 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 540 | 270 | MW | Integrity | - | - | - | |
12.06.2015 13:23 | Planned | 15.06.2015 23:00 | 18.06.2015 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | Plant | - | - | 580 | 0 | 580 | MW | Planned | - | - | - | |
12.06.2015 09:23 | Unplanned | 12.06.2015 09:30 | 12.06.2015 11:30 | Barry | E_BRYP-1 | - | Fossil Gas | - | - | - | 245 | 0 | 245 | MW | Boiler | - | - | - | |
11.06.2015 16:04 | Unplanned | 11.06.2015 15:55 | 11.06.2015 23:59 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 540 | 270 | MW | Early End to Planned Outage | - | - | - | |
10.06.2015 16:34 | Planned | 01.07.2015 00:01 | 21.07.2015 23:59 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | Plant | - | - | 810 | 0 | 810 | MW | Planned | - | - | - | |
08.06.2015 16:53 | Unplanned | 09.06.2015 06:30 | 09.06.2015 22:00 | Barry | E_BRYP-1 | - | Fossil Gas | - | - | - | 245 | - | - | MW | Commissioning- Variable Output | - | - | - | |
04.06.2015 16:05 | Planned | 11.06.2015 00:01 | 11.06.2015 23:59 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | Plant | - | - | 810 | 0 | 810 | MW | Planned | - | - | - | |
01.06.2015 20:23 | Unplanned | 01.06.2015 20:23 | 01.06.2015 21:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 0 | 580 | MW | 2 - Turbine | - | - | - | |
01.06.2015 15:34 | Unplanned | 03.06.2015 13:00 | 03.06.2015 16:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 424 | 156 | MW | Testing - Variable Output | - | - | - | |
28.05.2015 08:47 | Unplanned | 28.05.2015 08:45 | 28.05.2015 23:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 0 | 905 | MW | 7 - Early Start to Planned Outage | - | - | - | |
28.05.2015 06:44 | Planned | 08.06.2015 08:00 | 26.06.2015 18:00 | Barry | E_BRYP-1 | - | Fossil Gas | Plant | CANCELLED | Dismissed | 245 | 0 | 245 | MW | Planned | - | - | - | |
28.05.2015 06:39 | Planned | 05.09.2015 00:00 | 11.09.2015 00:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | GT | CANCELLED | Dismissed | 810 | 540 | 270 | MW | Planned | - | - | - | |
28.05.2015 06:38 | Planned | 06.06.2015 01:00 | 12.06.2015 00:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | GT | CANCELLED | Dismissed | 580 | 290 | 290 | MW | Planned | - | - | - | |
24.05.2015 03:40 | Unplanned | 24.05.2015 03:39 | 24.05.2015 10:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 260 | 320 | MW | 2 - Turbine | - | - | - | |
22.05.2015 15:16 | Planned | 26.05.2015 08:00 | 26.05.2015 08:30 | Barry | E_BRYP-1 | - | Fossil Gas | Plant | CANCELLED | Dismissed | 245 | 0 | 245 | MW | Planned | - | - | - | |
20.05.2015 01:56 | Unplanned | 20.05.2015 06:30 | 20.05.2015 22:00 | Barry | E_BRYP-1 | - | Fossil Gas | Plant | - | - | 245 | 220 | 25 | MW | 10 - Commissioning - Variable Output | - | - | - | |
12.05.2015 13:13 | Planned | 28.05.2015 23:00 | 02.06.2015 23:00 | Langage | T_LAGA-1 | - | Fossil Gas | GT | - | - | 905 | 452 | 453 | MW | Planned | - | - | - | |
12.05.2015 10:07 | Unplanned | 12.05.2015 14:20 | 12.05.2015 15:40 | Peterborough | E_PETEM1 | - | Fossil Gas | - | - | - | 240 | 0 | 240 | MW | Turbine | - | - | - | |
08.05.2015 12:43 | Unplanned | 08.05.2015 12:42 | 08.05.2015 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 262 | 318 | MW | 8 - Early End to Planned Outage | - | - | - | |
07.05.2015 13:15 | Unplanned | 07.05.2015 18:00 | 08.05.2015 06:00 | Barry | E_BRYP-1 | - | Fossil Gas | - | - | - | 245 | 147 | 98 | MW | Outage Ends | - | - | - | |
07.05.2015 11:32 | Unplanned | 07.05.2015 11:30 | 08.05.2015 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 0 | 580 | MW | 8 - Early End to Planned Outage | - | - | - | |
06.05.2015 12:22 | Unplanned | 07.05.2015 23:00 | 12.05.2015 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 0 | 580 | MW | Station Limit | - | - | - | |
06.05.2015 12:17 | Unplanned | 07.05.2015 23:00 | 12.05.2015 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 540 | 270 | MW | Integrity | - | - | - | |
05.05.2015 15:08 | Planned | 05.05.2015 23:00 | 06.05.2015 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | GT | - | - | 580 | 290 | 290 | MW | Planned | - | - | - | |
05.05.2015 15:03 | Planned | 05.05.2015 23:00 | 08.05.2015 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | GT | - | - | 580 | 290 | 290 | MW | Planned | - | - | - | |
04.05.2015 08:45 | Unplanned | 04.05.2015 09:00 | 04.05.2015 11:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 0 | 905 | MW | 7 - Early Start to Planned Outage | - | - | - | |
01.05.2015 22:13 | Unplanned | 01.05.2015 22:12 | 01.05.2015 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 408 | 497 | MW | 6 - Outage Ends | - | - | - | |
27.04.2015 14:22 | Planned | 04.05.2015 23:00 | 05.05.2015 05:00 | Langage | T_LAGA-1 | - | Fossil Gas | GT | - | - | 905 | 452 | 453 | MW | Planned | - | - | - | |
24.04.2015 10:43 | Planned | 02.04.2016 00:00 | 30.04.2016 23:59 | Peterborough | E_PETEM1 | - | Fossil Gas | GT | CANCELLED | Dismissed | 240 | 120 | 120 | MW | Planned | - | - | - | |
21.04.2015 08:49 | Unplanned | 21.04.2015 08:48 | 21.04.2015 10:10 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 405 | 500 | MW | 6 - Outage Ends | - | - | - | |
20.04.2015 10:48 | Planned | 04.04.2015 23:00 | 23.04.2015 18:00 | Barry | E_BRYP-1 | - | Fossil Gas | Plant | - | - | 245 | 0 | 245 | MW | Planned | - | - | - | |
14.04.2015 17:36 | Unplanned | 14.04.2015 17:32 | 15.04.2015 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 384 | 521 | MW | 6 - Outage Ends | - | - | - | |
11.04.2015 22:04 | Unplanned | 11.04.2015 22:04 | 11.04.2015 23:06 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 407 | 498 | MW | 6 - Outage Ends | - | - | - | |
10.04.2015 14:19 | Unplanned | 10.04.2015 14:20 | 10.04.2015 18:20 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 0 | 905 | MW | 1 - Boiler | - | - | - | |
05.04.2015 12:36 | Unplanned | 05.04.2015 12:33 | 07.04.2015 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 408 | 497 | MW | 8 - Early End to Planned Outage | - | - | - | |
02.04.2015 13:10 | Planned | 28.03.2015 22:00 | 07.04.2015 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | GT | - | - | 905 | 452 | 453 | MW | Planned | - | - | - | |
30.03.2015 11:33 | Unplanned | 30.03.2015 12:00 | 30.03.2015 14:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 503 | 307 | MW | 2 - Turbine | - | - | - | |
28.03.2015 00:10 | Unplanned | 28.03.2015 00:10 | 28.03.2015 12:00 | Killingholme | T_KILNS-1 | - | Fossil Gas | - | - | - | 665 | 665 | 0 | MW | 6 - Outage Ends | - | - | - | |
26.03.2015 15:56 | Unplanned | 26.03.2015 15:56 | 26.03.2015 17:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 782 | 28 | MW | 6 - Outage Ends | - | - | - | |
25.03.2015 16:16 | Unplanned | 26.03.2015 23:59 | 28.03.2015 22:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 0 | 905 | MW | 2 - Turbine | - | - | - | |
19.03.2015 12:10 | Unplanned | 19.03.2015 12:10 | 20.03.2015 12:40 | Killingholme | T_KILNS-1 | - | Fossil Gas | - | - | - | 665 | 665 | 0 | MW | 6 - Outage Ends | - | - | - | |
18.03.2015 09:56 | Planned | 17.03.2015 22:00 | 18.03.2015 04:00 | Langage | T_LAGA-1 | - | Fossil Gas | GT | - | - | 905 | 452 | 453 | MW | Planned | - | - | - | |
17.03.2015 12:11 | Unplanned | 17.03.2015 22:00 | 18.03.2015 04:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 0 | 905 | MW | 3 - Generator | - | - | - | |
16.03.2015 19:08 | Unplanned | 16.03.2015 19:11 | 16.03.2015 22:05 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 529 | 51 | MW | 6 - Outage Ends | - | - | - | |
15.03.2015 20:27 | Unplanned | 15.03.2015 20:26 | 15.03.2015 21:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 40 | 865 | MW | 2 - Turbine | - | - | - | |
14.03.2015 22:44 | Unplanned | 14.03.2015 22:43 | 14.03.2015 23:59 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 560 | 20 | MW | 6 - Outage Ends | - | - | - | |
13.03.2015 17:05 | Unplanned | 13.03.2015 16:14 | 13.03.2015 16:15 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | Dismissed | 580 | 580 | 0 | MW | 6 - Outage Ends | - | - | - | |
12.03.2015 17:16 | Unplanned | 12.03.2015 17:16 | 12.03.2015 19:10 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 416 | 489 | MW | 6 - Outage Ends | - | - | - | |
11.03.2015 20:56 | Unplanned | 11.03.2015 20:55 | 11.03.2015 23:59 | Killingholme | T_KILNS-1 | - | Fossil Gas | - | - | - | 665 | 665 | 0 | MW | 6 - Outage Ends | - | - | - | |
10.03.2015 16:11 | Planned | 11.03.2015 23:00 | 12.03.2015 03:00 | Langage | T_LAGA-1 | - | Fossil Gas | GT | - | - | 905 | 452 | 453 | MW | Planned | - | - | - | |
06.03.2015 12:31 | Unplanned | 07.03.2015 08:00 | 07.03.2015 12:00 | Killingholme | T_KILNS-1 | - | Fossil Gas | - | - | - | 665 | 432 | 233 | MW | 1 - Boiler | - | - | - | |
05.03.2015 13:19 | Unplanned | 01.04.2015 00:00 | 31.03.2018 23:59 | Brigg | E_BRGG-1 | - | Fossil Gas | - | CANCELLED | Dismissed | 99 | 0 | 99 | MW | Proposed Closure - Subject to Consultation | Production Unavailability | British Gas Trading Ltd | 21X000000001111W | |
05.03.2015 08:33 | Unplanned | 05.03.2015 08:32 | 05.03.2015 11:33 | Killingholme | T_KILNS-1 | - | Fossil Gas | - | - | - | 665 | 448 | 217 | MW | 1 - Boiler | - | - | - | |
04.03.2015 17:23 | Planned | 05.03.2015 00:01 | 13.03.2015 16:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | GT | - | - | 580 | 290 | 290 | MW | Planned | - | - | - | |
04.03.2015 17:20 | Planned | 05.03.2015 00:01 | 13.03.2015 16:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | GT | - | - | 580 | 290 | 290 | MW | Planned | - | - | - | |
04.03.2015 17:10 | Planned | 12.02.2015 00:01 | 05.03.2015 00:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | Plant | - | - | 580 | 0 | 580 | MW | Planned | - | - | - | |
25.02.2015 16:23 | Unplanned | 25.02.2015 15:49 | 25.02.2015 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 400 | 505 | MW | 6 - Outage Ends | - | - | - | |
21.02.2015 19:19 | Unplanned | 21.02.2015 20:00 | 21.02.2015 21:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 0 | 905 | MW | 3 - Generator | - | - | - | |
20.02.2015 22:43 | Unplanned | 21.02.2015 14:00 | 21.02.2015 16:00 | Killingholme | T_KILNS-1 | - | Fossil Gas | - | - | - | 665 | 0 | 665 | MW | 1 - Boiler | - | - | - | |
18.02.2015 03:08 | Unplanned | 18.02.2015 03:08 | 18.02.2015 04:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 405 | 500 | MW | 6 - Outage Ends | - | - | - | |
17.02.2015 14:14 | Planned | 21.02.2015 06:00 | 21.02.2015 14:00 | Killingholme | T_KILNS-1 | - | Fossil Gas | Plant | - | - | 665 | 0 | 665 | MW | Planned | - | - | - | |
14.02.2015 15:11 | Unplanned | 14.02.2015 15:11 | 14.02.2015 23:59 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 827 | 78 | MW | 6 - Outage Ends | - | - | - | |
12.02.2015 06:55 | Unplanned | 12.02.2015 06:55 | 12.02.2015 07:55 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 340 | 470 | MW | 2 - Turbine | - | - | - | |
11.02.2015 19:32 | Unplanned | 11.02.2015 19:31 | 11.02.2015 23:59 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 767 | 43 | MW | 6 - Outage Ends | - | - | - | |
11.02.2015 19:00 | Unplanned | 11.02.2015 20:20 | 11.02.2015 23:59 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 350 | 230 | MW | 1 - Boiler | - | - | - | |
11.02.2015 10:53 | Unplanned | 11.02.2015 10:48 | 11.02.2015 11:28 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 21 | 884 | MW | 2 - Turbine | - | - | - | |
09.02.2015 21:09 | Unplanned | 10.02.2015 05:00 | 10.02.2015 08:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 270 | 310 | MW | 2 - Turbine | - | - | - | |
09.02.2015 19:14 | Unplanned | 09.02.2015 19:14 | 10.02.2015 14:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 875 | 30 | MW | 6 - Outage Ends | - | - | - | |
09.02.2015 18:01 | Unplanned | 09.02.2015 17:58 | 09.02.2015 20:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 875 | 30 | MW | 6 - Outage Ends | - | - | - | |
05.02.2015 16:34 | Planned | 09.02.2015 03:01 | 09.02.2015 21:00 | Langage | T_LAGA-1 | - | Fossil Gas | GT | - | - | 905 | 452 | 453 | MW | Planned | - | - | - | |
05.02.2015 16:32 | Planned | 04.02.2015 21:00 | 09.02.2015 03:00 | Langage | T_LAGA-1 | - | Fossil Gas | Plant | - | - | 905 | 0 | 905 | MW | Planned | - | - | - | |
29.01.2015 16:54 | Planned | 04.02.2015 08:00 | 04.02.2015 18:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | GT | CANCELLED | Dismissed | 810 | 540 | 270 | MW | Planned | - | - | - | |
29.01.2015 16:54 | Planned | 02.02.2015 08:00 | 02.02.2015 18:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | GT | CANCELLED | Dismissed | 580 | 290 | 290 | MW | Planned | - | - | - | |
28.01.2015 14:04 | Planned | 06.02.2015 00:01 | 11.02.2015 23:59 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | Plant | - | - | 810 | 0 | 810 | MW | Planned | - | - | - | |
28.01.2015 13:07 | Planned | 11.04.2015 00:01 | 26.04.2015 23:59 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | Plant | CANCELLED | Dismissed | 580 | 0 | 580 | MW | Planned | - | - | - | |
28.01.2015 12:55 | Planned | 29.01.2015 08:00 | 29.01.2015 18:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | GT | CANCELLED | Dismissed | 580 | 290 | 290 | MW | Planned | - | - | - | |
26.01.2015 04:05 | Unplanned | 26.01.2015 04:00 | 26.01.2015 23:59 | Killingholme | T_KILNS-1 | - | Fossil Gas | - | - | - | 665 | 665 | 0 | MW | 6 - Outage Ends | - | - | - | |
25.01.2015 09:42 | Unplanned | 25.01.2015 09:43 | 25.01.2015 10:45 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 30 | 875 | MW | 2 - Turbine | - | - | - | |
19.01.2015 17:09 | Unplanned | 19.01.2015 17:15 | 19.01.2015 18:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 0 | 580 | MW | 6 - Outage Ends | - | - | - | |
19.01.2015 08:19 | Planned | 11.02.2015 08:00 | 11.02.2015 18:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | GT | - | - | 810 | 540 | 270 | MW | Planned | - | - | - | |
19.01.2015 08:18 | Planned | 09.02.2015 08:00 | 09.02.2015 18:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | GT | - | - | 810 | 540 | 270 | MW | Planned | - | - | - | |
16.01.2015 15:20 | Planned | 15.01.2015 20:00 | 16.01.2015 02:00 | Langage | T_LAGA-1 | - | Fossil Gas | Plant | - | - | 905 | 0 | 905 | MW | Planned | - | - | - | |
16.01.2015 03:06 | Unplanned | 16.01.2015 02:16 | 16.01.2015 06:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 841 | 64 | MW | 8 - Early End to Planned Outage | - | - | - | |
11.01.2015 13:13 | Unplanned | 11.01.2015 13:12 | 11.01.2015 14:21 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 869 | 36 | MW | 6 - Outage Ends | - | - | - | |
08.01.2015 09:40 | Unplanned | 08.01.2015 09:31 | 08.01.2015 14:00 | Killingholme | T_KILNS-1 | - | Fossil Gas | - | - | - | 665 | 433 | 232 | MW | 1 - Boiler | - | - | - | |
07.01.2015 18:12 | Unplanned | 07.01.2015 18:15 | 07.01.2015 21:00 | Killingholme | T_KILNS-1 | - | Fossil Gas | - | - | - | 665 | 665 | 0 | MW | 6 - Outage Ends | - | - | - | |
06.01.2015 01:00 | Unplanned | 06.01.2015 01:01 | 06.01.2015 08:00 | Langage | T_LAGA-1 | - | Fossil Gas | - | - | - | 905 | 881 | 24 | MW | 6 - Outage Ends | - | - | - | |
04.01.2015 11:37 | Unplanned | 04.01.2015 11:33 | 04.01.2015 23:00 | Humber Phase 2 | T_SHBA-2 | - | Fossil Gas | - | - | - | 580 | 540 | 40 | MW | 6 - Outage Ends | - | - | - | |
04.01.2015 10:32 | Unplanned | 04.01.2015 11:00 | 04.01.2015 23:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | - | - | - | 810 | 770 | 40 | MW | 6 - Outage Ends | - | - | - | |
02.01.2015 15:19 | Planned | 04.09.2015 23:00 | 11.09.2015 23:00 | Killingholme | T_KILNS-1 | - | Fossil Gas | Plant | - | - | 665 | 0 | 665 | MW | Planned | - | - | - | |
02.01.2015 15:18 | Planned | 10.07.2015 00:01 | 13.07.2015 23:59 | Killingholme | T_KILNS-1 | - | Fossil Gas | GT | - | - | 665 | 443 | 222 | MW | Planned | - | - | - | |
02.01.2015 15:11 | Planned | 04.01.2015 07:00 | 04.01.2015 13:00 | Humber Phase 1 | T_SHBA-1 | - | Fossil Gas | GT | - | - | 810 | 540 | 270 | MW | Planned | - | - | - |
Disclaimer
Any disclosures that are set out on this page are made pursuant to Regulation (EU) 1227/2011. They are based on the information that is available at the time of publication and are provided on a reasonable endeavours basis. A notification will be made of any material changes to these disclosures. We accept no liability for the content should it subsequently be demonstrated to be inaccurate.
All existing REMIT messages and historical REMIT messages published prior to 12/12/2016 (UMM and SMM) will be presented in accordance with the standards and electronic formats described in REMIT Manual of Procedures on data reporting v3.0 (the Manual). Not all of the data fields in the historical REMIT messages will be populated due to the REMIT messages being published prior to the Manual requirements coming into force.